      <LINENUM>1</LINENUM>
      <INTERVENOR_NAME>Algoma Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$10,169.72</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,169.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>2</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$10,169.72</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,169.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>3</LINENUM>
      <INTERVENOR_NAME>Association of Major Power Consumers</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$105,192.19</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$93,991.63</TOTAL_AWARDED>
      <PERCENT_AWARDED>89.35%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>4</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$36,287.20</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$36,287.20</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>5</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$3,076.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,076.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>6</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0033</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$57,766.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$46,565.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>80.61%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>7</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0161</CASENUM>
      <CASE_NAME>PowerStream 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$8,062.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,062.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>8</LINENUM>
      <INTERVENOR_NAME>AgriEnergy Producers Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$4,260.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,260.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>9</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$4,260.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,260.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>10</LINENUM>
      <INTERVENOR_NAME>Association of Power Producers of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$284,649.56</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$284,062.17</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.79%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>11</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$67,263.82</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$67,263.82</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>12</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$8,640.52</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,545.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>98.90%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>13</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$166,116.39</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$165,770.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.79%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>14</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$11,742.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,742.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>15</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$30,886.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,739.92</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.53%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>16</LINENUM>
      <INTERVENOR_NAME>Biogas Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$45,605.02</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,894.95</TOTAL_AWARDED>
      <PERCENT_AWARDED>67.74%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>17</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$45,605.02</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,894.95</TOTAL_AWARDED>
      <PERCENT_AWARDED>67.74%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>18</LINENUM>
      <INTERVENOR_NAME>The Building Owners and Managers Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$323,406.12</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$309,881.99</TOTAL_AWARDED>
      <PERCENT_AWARDED>95.82%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>19</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$78,881.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$78,868.35</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.98%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>20</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$19,096.31</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,096.31</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>21</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$4,486.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,486.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>22</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$113,308.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$113,278.61</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.97%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>23</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$38,130.07</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$25,829.09</TOTAL_AWARDED>
      <PERCENT_AWARDED>67.74%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>24</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$32,404.18</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$32,404.18</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>25</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$23,729.99</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,550.38</TOTAL_AWARDED>
      <PERCENT_AWARDED>95.03%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>26</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0399</CASENUM>
      <CASE_NAME>Hydro One Networks, US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$3,479.27</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,479.27</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>27</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$2,983.20</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,983.20</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>28</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0048</CASENUM>
      <CASE_NAME>Union Gas, closure of Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$6,906.50</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,906.50</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>29</LINENUM>
      <INTERVENOR_NAME>Consumers Council of Canada</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$710,464.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$674,398.87</TOTAL_AWARDED>
      <PERCENT_AWARDED>94.92%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>30</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED>$2,796.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,796.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>31</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0142</CASENUM>
      <CASE_NAME>Toronto Hydro 2011 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$7,830.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,830.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>32</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$36,917.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$36,917.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>33</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,254.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,254.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>34</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$18,831.45</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,831.45</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>35</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0120</CASENUM>
      <CASE_NAME>CANDAS Access to the power poles of LDCs for purposes of Wireless Telecommunication</CASE_NAME>
      <TOTAL_CLAIMED>$183,267.29</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$183,267.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>36</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$16,519.47</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,519.47</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>37</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$141,477.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$141,477.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>38</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$83,989.66</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$83,989.66</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>39</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$12,492.15</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,492.15</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>40</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$35,798.40</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$35,798.40</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>41</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0361</CASENUM>
      <CASE_NAME>Goldcorp, TSC exemptions</CASE_NAME>
      <TOTAL_CLAIMED>$26,718.18</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,695.97</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.92%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>42</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0033</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$82,515.49</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$46,471.88</TOTAL_AWARDED>
      <PERCENT_AWARDED>56.32%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>43</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0035</CASENUM>
      <CASE_NAME>Toronto Hydro motion related to 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$8,838.72</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,838.72</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>44</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0161</CASENUM>
      <CASE_NAME>PowerStream 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$42,217.37</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$42,217.37</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>45</LINENUM>
      <INTERVENOR_NAME>Canadian District Energy Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$18,252.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,252.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>46</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$18,252.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,252.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>47</LINENUM>
      <INTERVENOR_NAME>Canadian Federation of Independent Business</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$50,400.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$50,145.47</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.49%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>48</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$50,400.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$50,145.47</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.49%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>49</LINENUM>
      <INTERVENOR_NAME>Chippewas of the Thames First Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$20,070.70</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,070.70</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>50</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0082</CASENUM>
      <CASE_NAME>Hydro One Networks - Lambton to Longwood Transmission Upgrade Project</CASE_NAME>
      <TOTAL_CLAIMED>$20,070.70</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,070.70</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>51</LINENUM>
      <INTERVENOR_NAME>Canadian Manufacturers &amp; Exporters</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$682,586.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$676,851.12</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.16%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>52</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>Ontario Energy Board, Customer Service Standards for Natural Gas Distributors</CASE_NAME>
      <TOTAL_CLAIMED>$2,869.07</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,869.07</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>53</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$96,765.08</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$96,557.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.79%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>54</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$24,628.70</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,590.65</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.85%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>55</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$132,845.35</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$128,066.65</TOTAL_AWARDED>
      <PERCENT_AWARDED>96.40%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>56</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$227,005.67</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$226,943.77</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.97%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>57</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$58,722.27</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$58,547.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.70%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>58</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$34,803.28</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,780.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.93%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>59</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$35,530.02</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$55,776.03</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>61</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0399</CASENUM>
      <CASE_NAME>Hydro One Networks, US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$4,457.85</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,457.85</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>62</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0432</CASENUM>
      <CASE_NAME>Ontario Power Generation, US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$1,345.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,345.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>63</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$1,193.56</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,193.56</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>64</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0048</CASENUM>
      <CASE_NAME>Union Gas, closure of Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$12,042.98</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,042.98</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>65</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0054</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,115.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,115.59</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>66</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0070</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,386.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,386.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>67</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0180</CASENUM>
      <CASE_NAME>Hydro One Networks, Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$1,328.88</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,328.88</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>68</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0206</CASENUM>
      <CASE_NAME>Union Gas 2010 Earnings Sharing &amp; Deferral Accounts</CASE_NAME>
      <TOTAL_CLAIMED>$19,349.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,349.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>69</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0238</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$795.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$795.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>70</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0249</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,220.97</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,220.97</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>71</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0345</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,081.41</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,081.41</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>72</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0352</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,220.68</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,220.68</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>73</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0428</CASENUM>
      <CASE_NAME>Enbridge Gas 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,064.74</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,064.74</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>74</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0437</CASENUM>
      <CASE_NAME>Union Gas 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$1,114.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,114.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>75</LINENUM>
      <INTERVENOR_NAME>The Council of Canadians</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$23,119.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,119.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>76</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$23,119.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,119.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>77</LINENUM>
      <INTERVENOR_NAME>Canadian Solar Industries Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$5,308.74</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,308.74</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>78</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$5,308.74</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,308.74</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>79</LINENUM>
      <INTERVENOR_NAME>City of Thunder Bay</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$32,806.57</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,806.57</TOTAL_AWARDED>
      <PERCENT_AWARDED>84.76%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>80</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$32,806.57</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,806.57</TOTAL_AWARDED>
      <PERCENT_AWARDED>84.76%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>81</LINENUM>
      <INTERVENOR_NAME>Canadian Wind Energy Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$5,734.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,734.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>82</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$5,734.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,734.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>83</LINENUM>
      <INTERVENOR_NAME>Energy Probe Research Foundation </INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$525,434.71</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$522,565.53</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.45%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>84</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$45,065.48</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$45,065.48</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>85</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,936.28</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,936.28</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>86</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$12,910.54</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,822.04</TOTAL_AWARDED>
      <PERCENT_AWARDED>76.08%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>87</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0103</CASENUM>
      <CASE_NAME>Wasaga Distribution 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,763.22</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,761.70</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.99%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>88</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0120</CASENUM>
      <CASE_NAME>CANDAS Access to the power poles of LDCs for purposes of Wireless Telecommunication</CASE_NAME>
      <TOTAL_CLAIMED>$70,744.31</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$70,744.31</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>89</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0123</CASENUM>
      <CASE_NAME>Guelph Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$26,405.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,405.68</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>90</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$3,213.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,213.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>91</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0178</CASENUM>
      <CASE_NAME>Kingston Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,148.64</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,148.64</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>92</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0207</CASENUM>
      <CASE_NAME>Woodstock Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,535.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,535.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>93</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$77,997.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$77,997.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>94</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$18,845.81</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,845.81</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>95</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0249</CASENUM>
      <CASE_NAME>Wellington North Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$14,256.51</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,256.51</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>96</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0271</CASENUM>
      <CASE_NAME>Halton Hills Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$33,983.97</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,204.81</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.65%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>97</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0272</CASENUM>
      <CASE_NAME>Norfolk Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$13,418.51</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,418.51</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>98</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,535.25</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,535.25</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>99</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$24,619.61</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,619.61</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>100</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0033</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$62,229.83</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$62,229.83</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>101</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0112</CASENUM>
      <CASE_NAME>Canadian Niagara Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$20,522.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,522.59</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>102</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0121</CASENUM>
      <CASE_NAME>Erie Thames 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$16,252.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,252.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>103</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0161</CASENUM>
      <CASE_NAME>PowerStream 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$34,913.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,913.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>104</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0300</CASENUM>
      <CASE_NAME>Great Lakes Power 2013 Transmission Rates</CASE_NAME>
      <TOTAL_CLAIMED>$13,136.14</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,136.15</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>105</LINENUM>
      <INTERVENOR_NAME>Electrical Contractors Association of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$37,781.35</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$37,619.96</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.57%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>106</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$37,781.35</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$37,619.96</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.57%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>107</LINENUM>
      <INTERVENOR_NAME>Federation of Rental-housing Providers of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$313,512.94</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$313,502.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>108</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>Ontario Energy Board, Customer Service Standards for Natural Gas Distributors</CASE_NAME>
      <TOTAL_CLAIMED>$4,847.70</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,847.70</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>109</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$33,633.34</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$33,622.99</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.97%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>110</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$12,790.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,790.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>111</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$56,914.61</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$56,914.61</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>112</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$122,935.43</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$122,935.43</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>113</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$26,277.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,277.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>114</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$17,977.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,977.59</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>115</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$28,067.52</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$28,067.52</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>116</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0048</CASENUM>
      <CASE_NAME>Union Gas, closure of Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$7,830.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,830.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>117</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0206</CASENUM>
      <CASE_NAME>Union Gas 2010 Earnings Sharing &amp; Deferral Accounts</CASE_NAME>
      <TOTAL_CLAIMED>$2,237.40</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,237.40</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>118</LINENUM>
      <INTERVENOR_NAME>Green Energy Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$87,946.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$87,756.08</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.78%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>119</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$22,107.62</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,917.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.14%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>120</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$65,838.61</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$65,838.30</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>121</LINENUM>
      <INTERVENOR_NAME>Huron County Federation of Agriculture</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$28,661.12</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,000.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>69.78%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>122</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0076,EB-2011-0077, EB-2011-0078</CASENUM>
      <CASE_NAME>Tribute Resources Project</CASE_NAME>
      <TOTAL_CLAIMED>$28,661.12</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,000.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>69.78%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>123</LINENUM>
      <INTERVENOR_NAME>Industrial Gas User's Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$107,185.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$107,185.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>124</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$6,795.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,795.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>125</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$11,640.17</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,640.17</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>126</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$50,936.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$50,936.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>127</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$5,354.99</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,354.99</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>128</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$28,671.39</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$28,671.39</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>129</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0054</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$539.08</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$539.08</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>130</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0070</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$502.35</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$502.35</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>131</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0238</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$327.21</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$327.21</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>132</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0249</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$364.50</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$364.50</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>133</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0345</CASENUM>
      <CASE_NAME>Union Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$439.08</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$439.08</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>134</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0352</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$606.32</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$606.32</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>135</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0428</CASENUM>
      <CASE_NAME>Enbridge Gas 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$494.45</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$494.45</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>136</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0437</CASENUM>
      <CASE_NAME>Union Gas 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED>$513.66</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$513.66</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>137</LINENUM>
      <INTERVENOR_NAME>Low-Income Energy Network</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$70,937.93</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$70,739.43</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.72%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>138</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2007-0722</CASENUM>
      <CASE_NAME>Ontario Energy Board, Electricity Distributors Rate Classification</CASE_NAME>
      <TOTAL_CLAIMED>$1,678.05</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,678.05</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>139</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED>$157.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$152.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>97.29%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>140</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>Ontario Energy Board, Customer Service Standards for Natural Gas Distributors</CASE_NAME>
      <TOTAL_CLAIMED>$7,551.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,551.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>141</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$32,221.95</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$32,221.95</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>142</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$23,363.24</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,169.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.17%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>143</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$1,491.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,491.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>144</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0062</CASENUM>
      <CASE_NAME>Ontario Energy Board, RRR review project</CASE_NAME>
      <TOTAL_CLAIMED>$4,474.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,474.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>145</LINENUM>
      <INTERVENOR_NAME>London Property Management Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$242,984.58</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$242,984.58</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>146</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>Ontario Energy Board, Customer Service Standards for Natural Gas Distributors</CASE_NAME>
      <TOTAL_CLAIMED>$4,567.29</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,567.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>147</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$50,950.67</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$50,950.67</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>148</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$5,318.85</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,318.85</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>149</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$22,671.46</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,671.46</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>150</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$104,649.94</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$104,649.94</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>151</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$25,534.92</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$25,534.92</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>152</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$25,898.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$25,898.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>153</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$1,081.41</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,081.41</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>154</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0180</CASENUM>
      <CASE_NAME>Hydro One Networks, Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$820.38</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$820.38</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>155</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0206</CASENUM>
      <CASE_NAME>Union Gas 2010 Earnings Sharing &amp; Deferral Accounts</CASE_NAME>
      <TOTAL_CLAIMED>$1,491.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,491.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>156</LINENUM>
      <INTERVENOR_NAME>McKinley Farms Ltd.</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$25,680.95</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,540.35</TOTAL_AWARDED>
      <PERCENT_AWARDED>83.88%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>157</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0076,EB-2011-0077, EB-2011-0078</CASENUM>
      <CASE_NAME>Tribute Resources Project</CASE_NAME>
      <TOTAL_CLAIMED>$25,680.95</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,540.35</TOTAL_AWARDED>
      <PERCENT_AWARDED>83.88%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>158</LINENUM>
      <INTERVENOR_NAME>Manitoulin Coalition for Safe Energy Alternatives</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$16,537.50</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$500.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>3.02%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>159</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0394</CASENUM>
      <CASE_NAME>McLean's Mountain Wind Leave to Construct</CASE_NAME>
      <TOTAL_CLAIMED>$16,537.50</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$500.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>3.02%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>160</LINENUM>
      <INTERVENOR_NAME>M<![CDATA[&eacute;]]>tis Nation of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$49,172.52</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$32,781.68</TOTAL_AWARDED>
      <PERCENT_AWARDED>66.67%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>161</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$49,172.52</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$32,781.68</TOTAL_AWARDED>
      <PERCENT_AWARDED>66.67%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>162</LINENUM>
      <INTERVENOR_NAME>National Chief's Office on behalf of the Assembly of Nations</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$84,927.41</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$84,927.41</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>163</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$62,386.17</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$62,386.17</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>164</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line                             </CASE_NAME>
      <TOTAL_CLAIMED>$22,541.24</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,541.24</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>165</LINENUM>
      <INTERVENOR_NAME>Nishnawbe Aski Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$27,374.25</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,362.95</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.96%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>166</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$2,843.08</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,831.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.60%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>167</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$24,531.17</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,531.17</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>168</LINENUM>
      <INTERVENOR_NAME>Northwestern Ontario Associated Chambers of Commerce</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$45,336.38</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$44,728.77</TOTAL_AWARDED>
      <PERCENT_AWARDED>98.66%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>169</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$45,336.38</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$44,728.77</TOTAL_AWARDED>
      <PERCENT_AWARDED>98.66%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>170</LINENUM>
      <INTERVENOR_NAME>Northwatch</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$43,344.36</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$39,966.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>92.21%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>172</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$25,842.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$25,842.59</TOTAL_AWARDED>
      <PERCENT_AWARDED>87.23%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>173</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$13,536.42</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,509.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.80%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>174</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0180</CASENUM>
      <CASE_NAME>Hydro One Networks, Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$614.72</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$614.72</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>175</LINENUM>
      <INTERVENOR_NAME>Ontario Association of Physical Plant Administrators</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$10,975.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,975.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>176</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,235.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,235.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>177</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$7,935.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,935.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>178</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,805.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,805.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>179</LINENUM>
      <INTERVENOR_NAME>Ontario Sustainable Energy Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$96,648.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$96,648.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>180</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$96,648.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$96,648.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>181</LINENUM>
      <INTERVENOR_NAME>Ontario Waterpower Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$11,043.49</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,043.49</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>182</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$11,043.49</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,043.49</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>183</LINENUM>
      <INTERVENOR_NAME>Pollution Probe</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$48,179.74</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$48,179.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>184</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$5,563.66</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,563.66</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>185</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$16,569.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,569.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>186</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$24,311.73</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,311.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>187</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$1,734.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,734.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>188</LINENUM>
      <INTERVENOR_NAME>Pic River First Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$68,796.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,398.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>50.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>189</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$68,796.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,398.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>50.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>190</LINENUM>
      <INTERVENOR_NAME>Retail Council of Canada</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$95,752.56</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$95,752.56</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>191</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$95,752.56</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$95,752.56</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>192</LINENUM>
      <INTERVENOR_NAME>School Energy Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$623,470.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$623,472.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>193</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0142</CASENUM>
      <CASE_NAME>Toronto Hydro 2011 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$6,105.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,105.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>194</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$69,940.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$69,940.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>195</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$9,834.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,834.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>196</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$25,905.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$25,905.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>197</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0123</CASENUM>
      <CASE_NAME>Guelph Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$27,060.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,060.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>198</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED>$22,524.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,524.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>199</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0152</CASENUM>
      <CASE_NAME>Algoma Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,178.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,178.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>200</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0160</CASENUM>
      <CASE_NAME>Centre Wellington Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$3,242.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,242.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>201</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0169</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,903.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,903.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>202</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0173</CASENUM>
      <CASE_NAME>Hydro Hawkesbury 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$3,189.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,189.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>203</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0178</CASENUM>
      <CASE_NAME>Kingston Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$5,643.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,643.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>204</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0207</CASENUM>
      <CASE_NAME>Woodstock Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,584.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,584.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>205</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$117,780.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$117,780.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>206</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$29,300.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$29,300.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>207</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0250</CASENUM>
      <CASE_NAME>Lakefront Utilities 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$7,463.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,463.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>208</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0271</CASENUM>
      <CASE_NAME>Halton Hills Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$15,020.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,020.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>209</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0272</CASENUM>
      <CASE_NAME>Norfolk Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$14,190.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,190.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>210</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0274</CASENUM>
      <CASE_NAME>Rideau St. Lawrence 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$6,532.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,534.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.03%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>211</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$19,086.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,086.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>212</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$43,890.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$43,890.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>213</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0361</CASENUM>
      <CASE_NAME>Goldcorp, TSC exemptions</CASE_NAME>
      <TOTAL_CLAIMED>$18,366.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,366.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>214</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0399</CASENUM>
      <CASE_NAME>Hydro One Networks, US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$3,905.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,905.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>215</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$495.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$495.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>216</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0033</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$64,944.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$64,944.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>217</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0035</CASENUM>
      <CASE_NAME>Toronto Hydro motion related to 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$3,520.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,520.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>218</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0062</CASENUM>
      <CASE_NAME>Ontario Energy Board, RRR review project</CASE_NAME>
      <TOTAL_CLAIMED>$4,059.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,059.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>219</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0079</CASENUM>
      <CASE_NAME>Toronto Hydro US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$2,706.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,706.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>220</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0112</CASENUM>
      <CASE_NAME>Canadian Niagara Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$18,494.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,494.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>221</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0121</CASENUM>
      <CASE_NAME>Erie Thames 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,551.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,551.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>222</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0147</CASENUM>
      <CASE_NAME>Midland Power 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$9,260.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,260.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>223</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0161</CASENUM>
      <CASE_NAME>PowerStream 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$42,626.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$42,626.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>224</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0180</CASENUM>
      <CASE_NAME>Hydro One Networks, Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$1,771.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,771.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>225</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0206</CASENUM>
      <CASE_NAME>Union Gas 2010 Earnings Sharing &amp; Deferral Accounts</CASE_NAME>
      <TOTAL_CLAIMED>$965.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$965.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>226</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0300</CASENUM>
      <CASE_NAME>Great Lakes Power 2013 Transmission Rates</CASE_NAME>
      <TOTAL_CLAIMED>$8,440.00</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,440.00</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>227</LINENUM>
      <INTERVENOR_NAME>Vulnerable Energy Consumers Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$737,761.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$737,520.34</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.97%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>228</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED>$2,143.76</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,030.27</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>230</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0142 </CASENUM>
      <CASE_NAME>Toronto Hydro 2011 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$14,269.40</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,269.41</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>231</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>Ontario Energy Board, Customer Service Standards for Natural Gas Distributors</CASE_NAME>
      <TOTAL_CLAIMED>$1,314.84</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,314.84</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>232</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377, 0378, 0379, EB-2011-0004, EB-2011-0043 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Coordinated Consultation to Develop a Renewed

Regulatory Framework for Electricity</CASE_NAME>
      <TOTAL_CLAIMED>$20,665.87</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,665.87</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>233</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0005</CASENUM>
      <CASE_NAME>PowerStream 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$977.04</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$977.04</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>234</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0025</CASENUM>
      <CASE_NAME>Union Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$9,510.51</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,510.51</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>235</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0038</CASENUM>
      <CASE_NAME>Union Gas 2010 ESM</CASE_NAME>
      <TOTAL_CLAIMED>$8,008.58</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,008.58</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>236</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0100</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$878.29</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$878.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>237</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0101</CASENUM>
      <CASE_NAME>PUC Distribution 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,075.78</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,075.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>238</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0103</CASENUM>
      <CASE_NAME>Wasaga Distribution 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$13,249.98</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,233.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.88%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>239</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0120</CASENUM>
      <CASE_NAME>CANDAS Access to the power poles of LDCs for purposes of Wireless Telecommunication</CASE_NAME>
      <TOTAL_CLAIMED>$32,149.51</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$32,137.96</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.96%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>240</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0123</CASENUM>
      <CASE_NAME>Guelph Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$18,971.65</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,971.65</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>241</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0146</CASENUM>
      <CASE_NAME>Fort Frances Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$532.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$532.69</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>242</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0147</CASENUM>
      <CASE_NAME>Brantford Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$631.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$631.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>243</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0148</CASENUM>
      <CASE_NAME>Middlesex Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$680.81</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$680.81</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>244</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0152</CASENUM>
      <CASE_NAME>Algoma Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,385.43</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,385.43</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>245</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0153</CASENUM>
      <CASE_NAME>Bluewater Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,372.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,372.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>246</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0154</CASENUM>
      <CASE_NAME>Brant County Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$532.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$532.69</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>247</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0155</CASENUM>
      <CASE_NAME>Burlington Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$938.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$938.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>248</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0156</CASENUM>
      <CASE_NAME>Cambridge and North Dumfries Hydro - 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$779.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$779.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>249</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0160</CASENUM>
      <CASE_NAME>Centre Wellington Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,507.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,507.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>250</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0161</CASENUM>
      <CASE_NAME>COLLUS Power Corporation 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$631.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$631.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>251</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0163</CASENUM>
      <CASE_NAME>Entegrus Powerlines 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,296.65</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,296.65</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>252</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0164</CASENUM>
      <CASE_NAME>Cooperative Hydro Embrun 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$730.18</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$730.18</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>253</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0165</CASENUM>
      <CASE_NAME>EnWin Utilities 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$878.29</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$878.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>254</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0166</CASENUM>
      <CASE_NAME>Essex Powerlines Corporation 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,075.78</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,075.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>255</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0167</CASENUM>
      <CASE_NAME>Festival Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,322.64</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,322.64</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>256</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0169</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,223.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,223.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>257</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0170</CASENUM>
      <CASE_NAME>Haldimand County Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,234.29</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,234.29</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>258</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0171</CASENUM>
      <CASE_NAME>Hearst Power 2012 EDR</CASE_NAME>
      <TOTAL_CLAIMED>$532.69</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$532.69</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>259</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0173</CASENUM>
      <CASE_NAME>Hydro Hawkesbury 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$3,001.27</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,001.27</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>260</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0176</CASENUM>
      <CASE_NAME>Innisfil Hydro Distribution 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$779.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$779.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>261</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0177</CASENUM>
      <CASE_NAME>Kenora Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$641.83</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$641.83</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>262</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0178</CASENUM>
      <CASE_NAME>Kingston Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$3,100.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,100.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>263</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0179</CASENUM>
      <CASE_NAME>Kitchener-Wilmot 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$779.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$779.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>264</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0180</CASENUM>
      <CASE_NAME>Lakeland Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$631.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$631.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>265</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0181</CASENUM>
      <CASE_NAME>London Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$592.46</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$592.46</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>266</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0182</CASENUM>
      <CASE_NAME>Midland Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$779.55</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$779.55</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>267</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0183</CASENUM>
      <CASE_NAME>Milton Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,026.41</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,026.41</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>268</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0185</CASENUM>
      <CASE_NAME>Niagara Peninsula 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$296.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$296.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>269</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0186</CASENUM>
      <CASE_NAME>Niagara-on-the-Lake Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,629.68</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,629.68</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>270</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0187</CASENUM>
      <CASE_NAME>North Bay Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,372.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,372.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>271</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0188</CASENUM>
      <CASE_NAME>Northern Ontario Wires 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$641.83</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$641.83</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>272</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0189</CASENUM>
      <CASE_NAME>Oakville Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,036.80</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,036.80</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>273</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0190</CASENUM>
      <CASE_NAME>Orangeville Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,421.38</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,421.38</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>274</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0191</CASENUM>
      <CASE_NAME>Orillia Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,075.78</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,075.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>275</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0194</CASENUM>
      <CASE_NAME>Peterborough Distribution 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$828.92</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$828.92</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>276</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0195</CASENUM>
      <CASE_NAME>Renfrew Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$927.66</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$927.66</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>277</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0196</CASENUM>
      <CASE_NAME>St. Thomas Energy 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$582.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$582.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>278</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0197</CASENUM>
      <CASE_NAME>Thunder Bay Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$828.92</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$828.92</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>279</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0198</CASENUM>
      <CASE_NAME>Tillsonburg Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$631.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$631.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>280</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0199</CASENUM>
      <CASE_NAME>Veridian Connections 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,223.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,223.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>281</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0201</CASENUM>
      <CASE_NAME>Waterloo North Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$582.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$582.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>282</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0203</CASENUM>
      <CASE_NAME>West Coast Huron 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$828.92</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$828.92</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>283</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0205</CASENUM>
      <CASE_NAME>Westario Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$582.06</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$582.06</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>284</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0207</CASENUM>
      <CASE_NAME>Woodstock Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,803.78</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,803.78</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>285</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0210</CASENUM>
      <CASE_NAME>Union Gas 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$164,360.12</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$164,205.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.91%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>286</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0242</CASENUM>
      <CASE_NAME>Enbridge Gas, biomethane program</CASE_NAME>
      <TOTAL_CLAIMED>$15,832.14</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,832.14</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>287</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0249</CASENUM>
      <CASE_NAME>Wellington North Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$17,933.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,935.52</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.01%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>288</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0250</CASENUM>
      <CASE_NAME>Lakefront Utilities 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$16,347.16</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,347.16</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>289</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0271</CASENUM>
      <CASE_NAME>Halton Hills Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$21,535.33</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,535.33</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>290</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0272</CASENUM>
      <CASE_NAME>Norfolk Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$10,105.17</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,095.17</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.90%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>291</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0274</CASENUM>
      <CASE_NAME>Rideau St. Lawrence 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$16,908.45</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,908.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>292</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0277</CASENUM>
      <CASE_NAME>Enbridge Gas 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$16,238.54</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,238.54</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>293</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0293</CASENUM>
      <CASE_NAME>Atikokan Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$7,904.64</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,904.64</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>294</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0319</CASENUM>
      <CASE_NAME>Espanola Regional Hydro 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$9,054.47</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,054.48</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>295</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0322</CASENUM>
      <CASE_NAME>Chapleau Public Utilities 2012 EDR</CASE_NAME>
      <TOTAL_CLAIMED>$12,235.04</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,235.04</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>296</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0326</CASENUM>
      <CASE_NAME>Hydro 2000 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$9,237.67</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,237.67</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>297</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas DSM plan</CASE_NAME>
      <TOTAL_CLAIMED>$23,667.14</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,667.14</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>298</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0399</CASENUM>
      <CASE_NAME>Hydro One Networks, US GAAP Financial Reporting</CASE_NAME>
      <TOTAL_CLAIMED>$1,800.76</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,800.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>299</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0413</CASENUM>
      <CASE_NAME>Lakeland Power 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,458.18</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,458.18</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>300</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0415</CASENUM>
      <CASE_NAME>Welland Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,073.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,073.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>301</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0417</CASENUM>
      <CASE_NAME>Horizon Utilities Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,853.15</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,853.15</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>302</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0434</CASENUM>
      <CASE_NAME>Midland Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,211.32</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,211.32</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>303</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0435</CASENUM>
      <CASE_NAME>Innisfil Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,458.18</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,458.18</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>304</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0003 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Conservation and Demand Management Code and Target Proceedings</CASE_NAME>
      <TOTAL_CLAIMED>$1,372.01</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,372.01</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>305</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0008</CASENUM>
      <CASE_NAME>Peterborough Distribution Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,826.75</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,826.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>306</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0015</CASENUM>
      <CASE_NAME>Thunder Bay Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,122.97</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,122.97</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>307</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0017</CASENUM>
      <CASE_NAME>COLLUS Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,024.23</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,024.23</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>308</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0033</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$44,066.05</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$44,061.98</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.99%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>309</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0036</CASENUM>
      <CASE_NAME>Niagara-on-the-Lake Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,073.60</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,073.60</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>310</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0039</CASENUM>
      <CASE_NAME>Orangeville Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,419.20</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,419.20</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>311</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0081</CASENUM>
      <CASE_NAME>Burlington Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,974.86</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,974.86</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>312</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0084</CASENUM>
      <CASE_NAME>PUC Distribution 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,974.86</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,974.86</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>313</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0086</CASENUM>
      <CASE_NAME>Cambridge and North Dumfries Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,195.73</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,195.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>314</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0094</CASENUM>
      <CASE_NAME>Cooperative Hydro Embrun Rate Order</CASE_NAME>
      <TOTAL_CLAIMED>$1,948.88</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,948.87</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>315</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0112</CASENUM>
      <CASE_NAME>Canadian Niagara Power 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$18,681.91</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,681.91</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>316</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0121</CASENUM>
      <CASE_NAME>Erie Thames 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$18,720.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,720.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>317</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0127</CASENUM>
      <CASE_NAME>Grimsby Power 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$467.73</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$467.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>318</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0135</CASENUM>
      <CASE_NAME>Hydro One Brampton 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,405.79</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,405.79</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>319</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0147</CASENUM>
      <CASE_NAME>Midland Power 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$17,724.68</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,687.12</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.79%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>320</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0157</CASENUM>
      <CASE_NAME>Oshawa PUC Networks 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,010.82</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,010.82</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>321</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0161</CASENUM>
      <CASE_NAME>PowerStream 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$34,762.28</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,756.26</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.98%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>322</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0177</CASENUM>
      <CASE_NAME>Whitby Hydro 2013 Rates</CASE_NAME>
      <TOTAL_CLAIMED>$467.73</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$467.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>323</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0180</CASENUM>
      <CASE_NAME>Hydro One Networks, Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED>$1,543.51</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,543.51</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>324</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0187</CASENUM>
      <CASE_NAME>London Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,541.33</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,541.33</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>325</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0193</CASENUM>
      <CASE_NAME>Oakville Hydro 2012 Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,096.99</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,096.99</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>326</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0198</CASENUM>
      <CASE_NAME>Hydro Hawkesbury Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,751.39</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,751.39</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>327</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0201</CASENUM>
      <CASE_NAME>Veridian Connections, motion related to Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,629.26</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,629.26</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>328</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0212</CASENUM>
      <CASE_NAME>Thunder Bay Hydro, motion related to Rates</CASE_NAME>
      <TOTAL_CLAIMED>$2,160.49</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,156.75</TOTAL_AWARDED>
      <PERCENT_AWARDED>99.83%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>329</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0219</CASENUM>
      <CASE_NAME>Midland Power, motion related to Rates</CASE_NAME>
      <TOTAL_CLAIMED>$1,166.21</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,166.21</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>330</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0245</CASENUM>
      <CASE_NAME>Sioux Lookout Hydro Rate Order</CASE_NAME>
      <TOTAL_CLAIMED>$2,245.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,245.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>331</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0247</CASENUM>
      <CASE_NAME>Veridian Connections Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,294.48</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,294.47</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>332</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0260</CASENUM>
      <CASE_NAME>Festival Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,579.89</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,579.89</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>333</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0261</CASENUM>
      <CASE_NAME>Orillia Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,800.76</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,800.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>334</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0263</CASENUM>
      <CASE_NAME>Bluewater Power Smart Meter  cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,442.59</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,442.59</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>335</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0265</CASENUM>
      <CASE_NAME>Brant County Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,553.90</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,553.90</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>336</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0266</CASENUM>
      <CASE_NAME>Waterloo North Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,850.13</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,850.13</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>337</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0272</CASENUM>
      <CASE_NAME>Haldimand County Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,948.88</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,948.88</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>338</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0288</CASENUM>
      <CASE_NAME>Kitchener-Wilmot Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,146.36</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,146.36</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>339</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0289</CASENUM>
      <CASE_NAME>Entegrus Powerlines Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,245.10</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,245.10</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>340</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0300</CASENUM>
      <CASE_NAME>Great Lakes Power 2013 Transmission Rates</CASE_NAME>
      <TOTAL_CLAIMED>$8,453.44</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,453.44</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>341</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0310</CASENUM>
      <CASE_NAME>Kingston Hydro Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,195.73</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,195.73</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>342</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0327 (multiple decisions)</CASENUM>
      <CASE_NAME>Fort Frances Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,800.76</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,800.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>343</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0344</CASENUM>
      <CASE_NAME>Parry Sound Power Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$2,047.62</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,047.62</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>344</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0348</CASENUM>
      <CASE_NAME>St. Thomas Energy Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,998.25</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,998.25</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>345</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0353</CASENUM>
      <CASE_NAME>Northern Ontario Wires Smart Meter cost recovery</CASE_NAME>
      <TOTAL_CLAIMED>$1,800.76</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,800.76</TOTAL_AWARDED>
      <PERCENT_AWARDED>100.00%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>346</LINENUM>
      <INTERVENOR_NAME>Total</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED>$5,721,472.66</TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,547,100.32</TOTAL_AWARDED>
      <PERCENT_AWARDED>96.952%</PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2012 to March 31, 2013</DATEPERIOD>