      <LINENUM>1</LINENUM>
      <INTERVENOR_NAME>Algoma Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,327.32</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>2</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,327.32</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>3</LINENUM>
      <INTERVENOR_NAME>Association of Major Power Consumers</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$394,926.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>4</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$60,150.63</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>5</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0099</CASENUM>
      <CASE_NAME>ELK Energy Inc, 2012 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,353.48</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>6</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,052.75</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>7</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$88,052.68</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>8</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$146,095.41</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>9</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator, Smart Metering Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,869.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>10</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0107</CASENUM>
      <CASE_NAME>Bluewater Power Distribution Company, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,617.09</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>11</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0126</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,065.28</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>12</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,913.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>13</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0153</CASENUM>
      <CASE_NAME>Northern Ontario Wires Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,253.78</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>14</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0167</CASENUM>
      <CASE_NAME>Thunder Bay Hydro Electricity Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,548.35</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>15</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0175</CASENUM>
      <CASE_NAME>West Coast Huron Energy Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,593.80</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>16</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,360.43</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>17</LINENUM>
      <INTERVENOR_NAME>Association of Power Producers of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$686,371.38</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>18</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379, EB-2011-0004, EB-2011-0043 
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,628.50</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>19</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$54,077.90</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>20</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$262,929.05</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>21</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,776.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>22</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,747.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>23</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$141,306.43</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>24</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$163,905.74</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>25</LINENUM>
      <INTERVENOR_NAME>Building Owners &amp; Managers Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$524,746.16</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>26</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,187.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>27</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$97,895.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>28</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$33,872.87</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>29</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM  </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$130,504.40</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>30</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,703.22</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>31</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,694.14</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>32</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,810.41</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>33</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$160,043.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>34</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0010, EB-2013-0029</CASENUM>
      <CASE_NAME>RES Generators, Review of Certain Amendments to the Market Rules Made by the IESO</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,397.07</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>35</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0024</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga, LRAM Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,491.60</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>36</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,017.90</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>37</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0061</CASENUM>
      <CASE_NAME>Ontario Power Generation, Reliability Must Run - Thunder Bay GS Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,947.61</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>38</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0070</CASENUM>
      <CASE_NAME>PowerStream Inc, CDM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,316.70</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>39</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18 </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,864.50</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>40</LINENUM>
      <INTERVENOR_NAME>Lori Bryenton</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,978.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>41</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0365</CASENUM>
      <CASE_NAME>Dufferin Wind Power Inc, Leave to Construct a New Transmission Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,978.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>42</LINENUM>
      <INTERVENOR_NAME>Consumers Council of Canada</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$552,231.04</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>43</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,678.05</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>44</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$46,798.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>45</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$27,035.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>46</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$100,446.63</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>47</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$39,471.97</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>48</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$63,877.77</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>49</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,939.63</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>50</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$83,902.50</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>51</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,217.03</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>52</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator, Smart Metering Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,144.46</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>53</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,780.50</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>54</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,983.20</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>55</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,779.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>56</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,610.30</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>57</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$102,361.05</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>58</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,203.80</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>59</LINENUM>
      <INTERVENOR_NAME>Canadian Federation of Independent Businesses</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,237.40</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>60</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,237.40</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>61</LINENUM>
      <INTERVENOR_NAME>Canadian Manufacturers &amp; Exporters</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$678,434.71</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>62</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,047.28</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>63</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$163,331.43</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>64</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$28,193.61</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>65</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$48,519.52</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>66</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$35,733.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>67</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$85,049.30</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>68</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator, Smart Metering Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,820.15</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>69</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,674.94</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>70</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0246</CASENUM>
      <CASE_NAME>Ontario Energy Board, Policy Review of Micro-Embedded Generation Connection Issues</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,022.65</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>71</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,953.32</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>72</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,465.53</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>73</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,385.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>74</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,028.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>75</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$170,758.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>76</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0010, EB-2013-0029</CASENUM>
      <CASE_NAME>RES Generators, Review of Certain Amendments to the Market Rules Made by the IESO</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,976.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>77</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0033</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$886.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>78</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0045</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$688.17</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>79</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,459.99</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>80</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0061</CASENUM>
      <CASE_NAME>Ontario Power Generation, Reliability Must Run - Thunder Bay GS Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,248.62</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>81</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0099</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, Open Bill Access</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,287.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>82</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0141</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited, 2014 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,109.96</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>83</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,130.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>84</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0206</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$854.85</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>85</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0215</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$757.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>86</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0295</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$950.33</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>87</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0316</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$886.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>88</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0406</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2014 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,643.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>89</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0413</CASENUM>
      <CASE_NAME>Union Gas Limited, 2014 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,572.96</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>90</LINENUM>
      <INTERVENOR_NAME>Council of Canadians</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$152,606.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>91</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$152,606.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>92</LINENUM>
      <INTERVENOR_NAME>Conserve Our Rural Environment</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,528.39</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>93</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0365</CASENUM>
      <CASE_NAME>Dufferin Wind Power Inc, Leave to Construct a New Transmission Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,528.39</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>94</LINENUM>
      <INTERVENOR_NAME>City of Thunder Bay</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$45,598.89</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>95</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$45,598.89</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>96</LINENUM>
      <INTERVENOR_NAME>Energy Probe Research Foundation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$674,332.57</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>97</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,902.46</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>98</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0099</CASENUM>
      <CASE_NAME>ELK Energy Inc, 2012 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,110.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>99</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$52,486.68</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>100</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,118.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>101</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$39,462.94</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>102</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,647.21</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>103</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$103,008.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>104</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,673.96</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>105</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator - Smart Metering Entity Costs Recovery </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,203.98</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>106</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0107</CASENUM>
      <CASE_NAME>Bluewater Power Distribution Company, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,909.24</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>107</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0116</CASENUM>
      <CASE_NAME>Collus PowerStream Corporation, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,359.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>108</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0126</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,187.53</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>109</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,898.71</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>110</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0137</CASENUM>
      <CASE_NAME>Hydro One Remote Communities, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,054.61</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>111</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0139</CASENUM>
      <CASE_NAME>Innisfil Hydro Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,227.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>112</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0145</CASENUM>
      <CASE_NAME>Lakeland Power Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,546.62</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>113</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0146, EB-2013-0380</CASENUM>
      <CASE_NAME>London Hydro Inc, 2013 EDR Cost of Service and Variance and Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,773.29</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>114</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0160</CASENUM>
      <CASE_NAME>Peterborough Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,988.53</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>115</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0162</CASENUM>
      <CASE_NAME>PUC Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,476.56</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>116</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0167</CASENUM>
      <CASE_NAME>Thunder Bay Hydro Electricity Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,417.84</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>117</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0168</CASENUM>
      <CASE_NAME>Tillsonburg Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,758.34</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>118</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0173</CASENUM>
      <CASE_NAME>Welland Hydro Electric System, 2013 EDR  Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,378.34</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>119</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0176</CASENUM>
      <CASE_NAME>Westario Power Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,980.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>120</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,387.06</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>121</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$100,955.51</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>122</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0010, EB-2013-0029</CASENUM>
      <CASE_NAME>RES Generators, Review of Certain Amendments to the Market Rules Made by the IESO</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,235.11</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>123</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,720.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>124</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0061</CASENUM>
      <CASE_NAME>Ontario Power Generation,Reliability Must Run - Thunder Bay GS Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,973.26</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>125</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0099</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, Open Bill Access</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,045.44</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>126</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0143</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited - 2014 EDR - IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,653.41</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>127</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$792.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>128</LINENUM>
      <INTERVENOR_NAME>Environmental Defence</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$236,817.54</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>129</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$37,837.07</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>130</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,086.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>131</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,119.16</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>132</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$145,712.58</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>133</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0053</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, Guelph Area Transmission Reinforcement Project</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$28,061.87</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>134</LINENUM>
      <INTERVENOR_NAME>Federation of Rental-Housing Providers of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$247,006.65</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>135</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,509.34</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>136</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$46,400.47</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>137</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,834.79</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>138</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$36,317.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>139</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$111,503.71</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>140</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,654.36</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>141</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$786.71</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>142</LINENUM>
      <INTERVENOR_NAME>Green Energy Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$407,861.35</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>143</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,277.83</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>144</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$63,234.71</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>145</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,779.19</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>146</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,613.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>147</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$319,956.54</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>148</LINENUM>
      <INTERVENOR_NAME>Group of Intervenors</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,732.69</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>149</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0040, EB-2013-0041</CASENUM>
      <CASE_NAME>Bornish Wind LP, Leave to Construct a Transmission Line and Transmission Facilities</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,732.69</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>150</LINENUM>
      <INTERVENOR_NAME>HVAC Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$35,739.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>151</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,110.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>152</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0099</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, Open Bill Access</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,629.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>153</LINENUM>
      <INTERVENOR_NAME>Industrial Gas Users Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$152,112.75</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>154</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,181.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>155</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$15,071.56</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>156</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$28,355.38</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>157</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,457.94</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>158</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$91,503.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>159</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0033</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$551.23</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>160</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0045</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$569.03</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>161</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,503.29</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>162</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$317.03</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>163</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0206</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$531.74</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>164</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0215</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$364.50</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>165</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0295</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$904.92</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>166</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0316</CASENUM>
      <CASE_NAME>Union Gas Limited, 2013 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$531.74</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>167</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0406</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2014 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$718.47</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>168</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0413</CASENUM>
      <CASE_NAME>Union Gas Limited, 2014 QRAM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$550.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>169</LINENUM>
      <INTERVENOR_NAME>Low Income Energy Network</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$34,475.07</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>170</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$260.65</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>171</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0280</CASENUM>
      <CASE_NAME>OEB Initiative - GDAR Residential Customer Service Amendments Approved and Issued by the Board</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$4,101.90</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>172</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,814.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>173</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,941.55</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>174</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0099</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, Open Bill Access</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,356.87</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>175</LINENUM>
      <INTERVENOR_NAME>London Property Management Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$120,998.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>176</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,658.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>177</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,807.30</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>178</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0146, EB-2013-0380</CASENUM>
      <CASE_NAME>London Hydro Inc, 2013 EDR Cost of Service and Variance and Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,202.82</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>179</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,237.40</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>180</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,807.27</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>181</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$59,837.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>182</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$447.48</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>183</LINENUM>
      <INTERVENOR_NAME>Markham Gateway</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$79,435.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>184</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$79,435.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>185</LINENUM>
      <INTERVENOR_NAME>Metis Nation of Ontario</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$41,865.82</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>186</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$41,865.82</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>187</LINENUM>
      <INTERVENOR_NAME>Nishnawbe Aski Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$124,690.81</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>188</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0021</CASENUM>
      <CASE_NAME>Hydro One Remote Communities, ED Licence Amendment Requesting Exemptions from Specific DSC Amendments and LEAP</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$70,236.84</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>189</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,228.33</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>190</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0137</CASENUM>
      <CASE_NAME>Hydro One Remote Communities, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,225.64</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>191</LINENUM>
      <INTERVENOR_NAME>Northwestern Ontario Association of Chamber of Commerce</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$26,712.90</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>192</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,908.73</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>193</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0246</CASENUM>
      <CASE_NAME>Ontario Energy Board, Policy Review of Micro-Embedded Generation Connection Issues</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,197.31</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>194</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0061</CASENUM>
      <CASE_NAME>Ontario Power Generation, Reliability Must Run - Thunder Bay GS Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,606.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>195</LINENUM>
      <INTERVENOR_NAME>Northwatch</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$29,203.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>196</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$29,203.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>197</LINENUM>
      <INTERVENOR_NAME>Ontario Greenhouse Vegetable Growers</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,691.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>198</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0202</CASENUM>
      <CASE_NAME>Union Gas Limited, Distribution Rates 2014-18 </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,691.66</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>199</LINENUM>
      <INTERVENOR_NAME>Ontario Sustainable Energy Association</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,719.92</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>200</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,056.80</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>201</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0141</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited, 2014 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,663.12</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>202</LINENUM>
      <INTERVENOR_NAME>Pic River First Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$40,751.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>203</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$40,751.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>204</LINENUM>
      <INTERVENOR_NAME>Retail Council of Canada</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,843.30</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>205</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,936.99</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>206</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,906.31</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>207</LINENUM>
      <INTERVENOR_NAME>Ritzema Dairy Ltd.</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,612.91</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>208</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0442</CASENUM>
      <CASE_NAME>Varna Wind GP, Leave to Construct Transmission Facilities in Huron County</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,612.91</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>209</LINENUM>
      <INTERVENOR_NAME>Residents Group</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,656.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>210</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0458</CASENUM>
      <CASE_NAME>K2 Wind Limited Ontario Partnership, Leave to Construct Transmission Facilities</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,656.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>211</LINENUM>
      <INTERVENOR_NAME>School Energy Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$818,457.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>212</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$66,495.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>213</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0099</CASENUM>
      <CASE_NAME>ELK Energy Inc, 2012 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,632.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>214</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0140</CASENUM>
      <CASE_NAME>Ontario Energy Board, East-West Transmission Tie Line</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,876.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>215</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$82,560.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>216</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$43,725.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>217</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$43,528.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>218</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0047</CASENUM>
      <CASE_NAME>Horizon Utilities Corporation, Service Area Amendment - Schedule 1 Amendment to add Summit Park 7   </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,229.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>219</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,184.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>220</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$137,021.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>221</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,151.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>222</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator, Smart Metering Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,538.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>223</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0107</CASENUM>
      <CASE_NAME>Bluewater Power Distribution Company, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,256.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>224</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0116</CASENUM>
      <CASE_NAME>Collus PowerStream Corporation, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,370.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>225</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0124</CASENUM>
      <CASE_NAME>Festival Hydro Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,598.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>226</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0126</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,024.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>227</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$35,641.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>228</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0139</CASENUM>
      <CASE_NAME>Innisfil Hydro Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,786.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>229</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0145</CASENUM>
      <CASE_NAME>Lakeland Power Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,799.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>230</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0146, EB-2013-0380</CASENUM>
      <CASE_NAME>London Hydro Inc, 2013 EDR Cost of Service and Variance and Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$24,570.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>231</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0153</CASENUM>
      <CASE_NAME>Northern Ontario Wires Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,271.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>232</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0160</CASENUM>
      <CASE_NAME>Peterborough Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$22,243.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>233</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0162</CASENUM>
      <CASE_NAME>PUC Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,428.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>234</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0167</CASENUM>
      <CASE_NAME>Thunder Bay Hydro Electricity Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,690.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>235</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0173</CASENUM>
      <CASE_NAME>Welland Hydro Electric System, 2013 EDR  Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,537.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>236</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0175</CASENUM>
      <CASE_NAME>West Coast Huron Energy Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,934.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>237</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0176</CASENUM>
      <CASE_NAME>Westario Power Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,752.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>238</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,135.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>239</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0340</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation on IRM for Setting Payments for OPG's Prescribed Generation Assets (EB-2010-0008)</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$12,224.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>240</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,108.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>241</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,838.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>242</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$90,655.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>243</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0010, EB-2013-0029</CASENUM>
      <CASE_NAME>RES Generators, Review of Certain Amendments to the Market Rules Made by the IESO</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,889.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>244</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,239.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>245</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0141</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited, 2014 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,236.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>246</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0287</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, Disposition and Recovery of Amounts Related to Smart Meter Activities from 2008 to 2010</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,295.00</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>247</LINENUM>
      <INTERVENOR_NAME>Thunder Bay Terminals Limited</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,345.77</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>248</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0226, EB-2012-0227</CASENUM>
      <CASE_NAME>Union Gas Limited, Leave to Construct Application - Thunder Bay Pipeline Project </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,345.77</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>249</LINENUM>
      <INTERVENOR_NAME>Vulnerable Energy Consumers Coalition</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$900,985.93</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>250</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2008-0150 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Emergency Financial Assistance Working Group</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,915.52</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>251</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0018</CASENUM>
      <CASE_NAME>Natural Resource Gas Limited, Multi-Year Incentive Rate Mechanism Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,993.35</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>252</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2010-0377,0378,0379,
EB-2011-0004, EB-2011-0043
(multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Energy Board, Consultation Process to Implement the Renewed Regulatory Framework for Electricity Distributors.</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$65,521.18</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>253</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0099</CASENUM>
      <CASE_NAME>ELK Energy Inc, 2012 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,271.57</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>254</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2011-0354</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013 Gas Distribution Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$145,350.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>255</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0002 (multiple decisions)</CASENUM>
      <CASE_NAME>Ontario Power Generation, 2013-14 Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,865.14</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>256</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0031</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 Transmission Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$51,703.91</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>257</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0055</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2011 Earning Sharing Mechanism - Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$8,587.52</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>258</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0064</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, 2012-14 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$108,569.89</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>259</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0087</CASENUM>
      <CASE_NAME>Union Gas Limited, 2011 Earnings Sharing and Disposition of Deferral Accounts and Other Balances</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,799.01</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>260</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0100, EB-2012-0211</CASENUM>
      <CASE_NAME>Independent Electricity System Operator, Smart Metering Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,819.28</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>261</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0104</CASENUM>
      <CASE_NAME>Algoma Power Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,047.62</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>262</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0107</CASENUM>
      <CASE_NAME>Bluewater Power Distribution Company, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,876.70</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>263</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0113</CASENUM>
      <CASE_NAME>Centre Wellington Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,798.04</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>264</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0114</CASENUM>
      <CASE_NAME>Chapleau Public Utilities Corporation, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$444.34</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>265</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0116</CASENUM>
      <CASE_NAME>Collus PowerStream Corporation, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,750.84</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>266</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0123</CASENUM>
      <CASE_NAME>Essex Powerlines Corporation, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$246.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>267</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0124</CASENUM>
      <CASE_NAME>Festival Hydro Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,245.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>268</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0126</CASENUM>
      <CASE_NAME>Greater Sudbury Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,686.47</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>269</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0129</CASENUM>
      <CASE_NAME>Haldimand County Hydro Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$197.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>270</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0133</CASENUM>
      <CASE_NAME>Hydro 2000 Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$197.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>271</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0136</CASENUM>
      <CASE_NAME>Hydro One Networks Inc, 2013 EDR IRM application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$30,986.23</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>272</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0137</CASENUM>
      <CASE_NAME>Hydro One Remote Communities, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,249.04</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>273</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0139</CASENUM>
      <CASE_NAME>Innisfil Hydro Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,309.65</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>274</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0141</CASENUM>
      <CASE_NAME>Kenora Hydro Electric Corporation, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$493.72</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>275</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0144</CASENUM>
      <CASE_NAME>Lakefront Utilities Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,060.19</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>276</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0145</CASENUM>
      <CASE_NAME>Lakeland Power Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$17,382.85</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>277</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0146, EB-2013-0380</CASENUM>
      <CASE_NAME>London Hydro Inc, 2013 EDR Cost of Service and Variance and Deferral Account</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$23,356.23</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>278</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0148</CASENUM>
      <CASE_NAME>Milton Hydro Distribution Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,245.10</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>279</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0150</CASENUM>
      <CASE_NAME>Niagara Peninsula Energy Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$246.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>280</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0151</CASENUM>
      <CASE_NAME>Norfolk Power Distribution Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$740.57</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>281</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0153</CASENUM>
      <CASE_NAME>Northern Ontario Wires Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,806.78</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>282</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0155</CASENUM>
      <CASE_NAME>Orangeville Hydro Limited, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$246.86</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>283</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0158</CASENUM>
      <CASE_NAME>Ottawa River Power Corporation, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$296.23</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>284</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0160</CASENUM>
      <CASE_NAME>Peterborough Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$16,388.95</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>285</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0162</CASENUM>
      <CASE_NAME>PUC Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$20,551.23</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>286</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0163</CASENUM>
      <CASE_NAME>Renfrew Hydro Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$197.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>287</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0165</CASENUM>
      <CASE_NAME>Sioux Lookout Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$10,317.34</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>288</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0166</CASENUM>
      <CASE_NAME>St. Thomas Energy Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$197.49</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>289</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0167</CASENUM>
      <CASE_NAME>Thunder Bay Hydro Electricity Distribution Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$19,804.30</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>290</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0168</CASENUM>
      <CASE_NAME>Tillsonburg Hydro Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$14,986.85</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>291</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0173</CASENUM>
      <CASE_NAME>Welland Hydro Electric System, 2013 EDR  Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,068.05</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>292</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0175</CASENUM>
      <CASE_NAME>West Coast Huron Energy Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$21,505.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>293</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0176</CASENUM>
      <CASE_NAME>Westario Power Inc, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$18,119.57</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>294</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0178</CASENUM>
      <CASE_NAME>Woodstock Hydro Services Inc, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,751.39</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>295</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0246</CASENUM>
      <CASE_NAME>Ontario Energy Board, Policy Review of Micro-Embedded Generation Connection Issues</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,715.01</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>296</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0337 (multiple decisions)</CASENUM>
      <CASE_NAME>Union Gas Limited, CDM Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$741.09</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>297</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0342</CASENUM>
      <CASE_NAME>Natural Resource Gas Limited, 2012 Rates</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,773.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>298</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0394 (multiple decisions)</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2013-14 DSM Plan</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$3,579.70</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>299</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0397</CASENUM>
      <CASE_NAME>Ontario Energy Board, Regulatory Direction and Oversight: Consultation on Electricity Distributor Efficiency</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,619.29</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>300</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0414, EB-2012-0120</CASENUM>
      <CASE_NAME>Electricity Distributors Association, CANDAS - Access to the Power Poles of LDCs for Purposes of Wireless Telecommunications </CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$6,345.02</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>301</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0440</CASENUM>
      <CASE_NAME>Hydro One Brampton Networks Inc, 2013 Smart Meter Cost Recovery Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,047.62</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>302</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0451, EB-2012-0433, EB-2013-0074</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, and Union Gas Limited, Leave to Construct GTA-Parkway Pipelines</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$36,245.08</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>303</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0479</CASENUM>
      <CASE_NAME>Whitby Hydro Electric Corporation, 2013 Smart Meter Cost Recovery</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,948.87</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>304</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0018</CASENUM>
      <CASE_NAME>Erie Thames Powerlines Corporation, 2013 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$839.32</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>305</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0019</CASENUM>
      <CASE_NAME>Atikokan Hydro Inc, 2013 Smart Meter Cost Recovery</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$987.43</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>306</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0024</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga, LRAM Rates Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$641.83</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>307</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0046</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, 2012 Earnings Sharing Mechanism</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$5,831.03</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>308</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0061</CASENUM>
      <CASE_NAME>Ontario Power Generation, Reliability Must Run - Thunder Bay GS Application</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,058.01</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>309</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0070</CASENUM>
      <CASE_NAME>PowerStream Inc, CDM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,195.73</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>310</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0099</CASENUM>
      <CASE_NAME>Enbridge Gas Distribution Inc, Open Bill Access</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$11,023.04</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>311</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0122</CASENUM>
      <CASE_NAME>Cooperative Hydro Embrun Inc, 2014 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,260.15</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>312</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0124</CASENUM>
      <CASE_NAME>Enersource Hydro Mississauga, 2014 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$657.42</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>313</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0141</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited, 2014 EDR IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$9,150.25</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>314</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0143</CASENUM>
      <CASE_NAME>Hydro Ottawa Limited - 2014 EDR - IRM</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,195.31</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>315</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0193</CASENUM>
      <CASE_NAME>Milton Hydro Distribution Inc, Notice of Motion to Vary Board's Decision and Order EB-2012-0148</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$1,132.94</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>316</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2013-0287</CASENUM>
      <CASE_NAME>Toronto Hydro Electric System Limited, Disposition and Recovery of Amounts Related to Smart Meter Activities from 2008 to 2010</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$2,802.45</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>317</LINENUM>
      <INTERVENOR_NAME>Cat Lake First Nation</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,988.53</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>318</LINENUM>
      <INTERVENOR_NAME></INTERVENOR_NAME>
      <CASENUM>EB-2012-0137</CASENUM>
      <CASE_NAME>Hydro One Remote Communities, 2013 EDR Cost of Service</CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$13,988.53</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>
      <DATEPERIOD>April 1, 2013 to March 31, 2014</DATEPERIOD>
    </G_LINENUM>
    <G_LINENUM>
      <LINENUM>319</LINENUM>
      <INTERVENOR_NAME>Total</INTERVENOR_NAME>
      <CASENUM></CASENUM>
      <CASE_NAME></CASE_NAME>
      <TOTAL_CLAIMED></TOTAL_CLAIMED>
      <TOTAL_AWARDED>$7,131,022.97</TOTAL_AWARDED>
      <PERCENT_AWARDED></PERCENT_AWARDED>