	<PerformanceItemRow>
		<dist>Algoma Power Inc.</dist>
		<connections>0.994</connections>
		<appointments>1</appointments>
		<tele>0.866</tele>
		<firstcont>99.97%</firstcont>
		<billacc>99.85%</billacc>
		<custsurvey>79%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>5.46424674076279</powerouthrs>
		<powerouttimes>2.57206925216285</powerouttimes>
		<distplan>Completed</distplan>
		<efficiency>5</efficiency>
		<costpercust>2126</costpercust>
		<costperkm>13453</costperkm>
		<cumenergy>0.311881443456485</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.09582202756154</liquidity>
		<leverage>1.02465245691658</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0989</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Atikokan Hydro Inc.</dist>
		<connections>1</connections>
		<appointments/>
		<tele>1</tele>
		<firstcont>100</firstcont>
		<billacc>99.98%</billacc>
		<custsurvey>Favourable</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.00727272727273</powerouthrs>
		<powerouttimes>0.216969696969697</powerouttimes>
		<distplan>Completed</distplan>
		<efficiency>3</efficiency>
		<costpercust>974</costpercust>
		<costperkm>17357</costperkm>
		<cumenergy>0.264534963935772</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.6931642663972</liquidity>
		<leverage>0.195762784763091</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0273</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Bluewater Power Distribution Corporation</dist>
		<connections>0.983</connections>
		<appointments>0.996</appointments>
		<tele>0.691</tele>
		<firstcont>99.93%</firstcont>
		<billacc>99.96%</billacc>
		<custsurvey>73.5</custsurvey>
		<publicawareness>0.819</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.38284062474414</powerouthrs>
		<powerouttimes>1.3786780161614</powerouttimes>
		<distplan>Above budget</distplan>
		<efficiency>3</efficiency>
		<costpercust>685</costpercust>
		<costperkm>32211</costperkm>
		<cumenergy>0.217967145435615</cumenergy>
		<genconn>100%</genconn>
		<genfac>96.43%</genfac>
		<liquidity>1.4322583122305</liquidity>
		<leverage>0.823599521944366</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.1186</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Brantford Power Inc.</dist>
		<connections>0.997</connections>
		<appointments>0.998</appointments>
		<tele>0.671</tele>
		<firstcont>84.20%</firstcont>
		<billacc>99.89%</billacc>
		<custsurvey>94%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.446431528398742</powerouthrs>
		<powerouttimes>1.23772402460927</powerouttimes>
		<distplan>85.1%</distplan>
		<efficiency>3</efficiency>
		<costpercust>528</costpercust>
		<costperkm>41385</costperkm>
		<cumenergy>0.357418803996094</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>2.16304929158285</liquidity>
		<leverage>0.958768098397685</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0653</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Burlington Hydro Inc.</dist>
		<connections>0.967</connections>
		<appointments>1</appointments>
		<tele>0.747</tele>
		<firstcont>92</firstcont>
		<billacc>99.97%</billacc>
		<custsurvey>86</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.981764597807583</powerouthrs>
		<powerouttimes>0.597584774637813</powerouttimes>
		<distplan>OnTrack </distplan>
		<efficiency>2</efficiency>
		<costpercust>620</costpercust>
		<costperkm>27518</costperkm>
		<cumenergy>0.263934921276057</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>2.49918509306871</liquidity>
		<leverage>0.788520285671504</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0804</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Canadian Niagara Power Inc.</dist>
		<connections>0.911</connections>
		<appointments>1</appointments>
		<tele>0.757</tele>
		<firstcont>99.20%</firstcont>
		<billacc>99.81%</billacc>
		<custsurvey>85%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>3.46589727594094</powerouthrs>
		<powerouttimes>2.29188327441603</powerouttimes>
		<distplan>Complete</distplan>
		<efficiency>4</efficiency>
		<costpercust>796</costpercust>
		<costperkm>22371</costperkm>
		<cumenergy>0.513886392123625</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>0.32517794079917</liquidity>
		<leverage>1.63792470207647</leverage>
		<profitdeemed>0.0893</profitdeemed>
		<profitachieved>0.0897</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Centre Wellington Hydro Ltd.</dist>
		<connections>0.993</connections>
		<appointments>0.989</appointments>
		<tele>0.993</tele>
		<firstcont>.003</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>77.3</custsurvey>
		<publicawareness>0.841</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.100428210665007</powerouthrs>
		<powerouttimes>0.114335907477217</powerouttimes>
		<distplan>86.36</distplan>
		<efficiency>3</efficiency>
		<costpercust>677</costpercust>
		<costperkm>30086</costperkm>
		<cumenergy>0.371131126525348</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.756654932671</liquidity>
		<leverage>1.16236318354588</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0401</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Chapleau Public Utilities Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>1</tele>
		<firstcont>100</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>95</custsurvey>
		<publicawareness>0.76</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.8224</powerouthrs>
		<powerouttimes>0.6328</powerouttimes>
		<distplan>100</distplan>
		<efficiency>4</efficiency>
		<costpercust>740</costpercust>
		<costperkm>34163</costperkm>
		<cumenergy>0.448122812081614</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>2.03382912875212</liquidity>
		<leverage>0</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>-0.0382</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>COLLUS PowerStream Corp.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.689</tele>
		<firstcont>99.06</firstcont>
		<billacc>99.96%</billacc>
		<custsurvey>71.8</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.54075028720452</powerouthrs>
		<powerouttimes>0.839429295278411</powerouttimes>
		<distplan>90.75</distplan>
		<efficiency>2</efficiency>
		<costpercust>541</costpercust>
		<costperkm>26084</costperkm>
		<cumenergy>0.250191306224753</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.29044944738402</liquidity>
		<leverage>1.2594377917075</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.1003</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Cooperative Hydro Embrun Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.952</tele>
		<firstcont>95%</firstcont>
		<billacc>99.74%</billacc>
		<custsurvey>85.89</custsurvey>
		<publicawareness>0.75</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.0415617782773587</powerouthrs>
		<powerouttimes>0.229062073460443</powerouttimes>
		<distplan>Completed</distplan>
		<efficiency>1</efficiency>
		<costpercust>521</costpercust>
		<costperkm>32721</costperkm>
		<cumenergy>0.486303403792795</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>2.65446653164999</liquidity>
		<leverage>0</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0368</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>E.L.K. Energy Inc.</dist>
		<connections>0.939</connections>
		<appointments>0.989</appointments>
		<tele>0.972</tele>
		<firstcont>Excellent</firstcont>
		<billacc>99.97%</billacc>
		<custsurvey>88% Satis.</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.250355628540198</powerouthrs>
		<powerouttimes>0.087341339908815</powerouttimes>
		<distplan>In progress</distplan>
		<efficiency>1</efficiency>
		<costpercust>416</costpercust>
		<costperkm>31239</costperkm>
		<cumenergy>0.259862649307355</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>2.03727886348899</liquidity>
		<leverage>0.518971866685157</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0839</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Energy+ Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.715</tele>
		<firstcont>99.99</firstcont>
		<billacc>99.98%</billacc>
		<custsurvey>B</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.626865873294292</powerouthrs>
		<powerouttimes>1.26978750626245</powerouttimes>
		<distplan>On Plan</distplan>
		<efficiency>3</efficiency>
		<costpercust>639</costpercust>
		<costperkm>23739</costperkm>
		<cumenergy>0.906627232885325</cumenergy>
		<genconn>80%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.98766748204172</liquidity>
		<leverage>1.10368945996063</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0949</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Enersource Hydro Mississauga Inc.</dist>
		<connections>0.994</connections>
		<appointments>0.999</appointments>
		<tele>0.834</tele>
		<firstcont>70.3%</firstcont>
		<billacc>99.54%</billacc>
		<custsurvey>90%</custsurvey>
		<publicawareness>0.77</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>3</genincidents>
		<rateperkm>0.577</rateperkm>
		<powerouthrs>0.772645538323219</powerouthrs>
		<powerouttimes>1.02110391196849</powerouttimes>
		<distplan>97%</distplan>
		<efficiency>3</efficiency>
		<costpercust>780</costpercust>
		<costperkm>30597</costperkm>
		<cumenergy>0.323374751866975</cumenergy>
		<genconn>100%</genconn>
		<genfac>99.17%</genfac>
		<liquidity>0.787313789101032</liquidity>
		<leverage>1.65714605930305</leverage>
		<profitdeemed>0.0893</profitdeemed>
		<profitachieved>0.0613</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Entegrus Powerlines Inc.</dist>
		<connections>0.988</connections>
		<appointments>0.978</appointments>
		<tele>0.687</tele>
		<firstcont>79.3</firstcont>
		<billacc>99.84%</billacc>
		<custsurvey>83.0</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.510038075458636</powerouthrs>
		<powerouttimes>0.410646293823864</powerouttimes>
		<distplan>22</distplan>
		<efficiency>2</efficiency>
		<costpercust>567</costpercust>
		<costperkm>24291</costperkm>
		<cumenergy>0.990342155025987</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.66846517153327</liquidity>
		<leverage>1.43540816756078</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0746</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>ENWIN Utilities Ltd.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.707</tele>
		<firstcont>97.93%</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>GOOD</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.898</rateperkm>
		<powerouthrs>0.637840730535377</powerouthrs>
		<powerouttimes>1.46701432377656</powerouttimes>
		<distplan>83%</distplan>
		<efficiency>4</efficiency>
		<costpercust>707</costpercust>
		<costperkm>55668</costperkm>
		<cumenergy>0.309654374347011</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.60275094956982</liquidity>
		<leverage>0.385068729806169</leverage>
		<profitdeemed>0.0801</profitdeemed>
		<profitachieved>0.0592</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Erie Thames Powerlines Corporation</dist>
		<connections>0.996</connections>
		<appointments>1</appointments>
		<tele>0.984</tele>
		<firstcont>99.54</firstcont>
		<billacc>99.50%</billacc>
		<custsurvey>89</custsurvey>
		<publicawareness>0.834</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.46494888820284</powerouthrs>
		<powerouttimes>0.235852383049344</powerouttimes>
		<distplan>104</distplan>
		<efficiency>3</efficiency>
		<costpercust>676</costpercust>
		<costperkm>36550</costperkm>
		<cumenergy>0.313345132503576</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.881553676462726</liquidity>
		<leverage>1.54716737074093</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0933</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Espanola Regional Hydro Distribution Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.762</tele>
		<firstcont>99.17 %</firstcont>
		<billacc>99.95%</billacc>
		<custsurvey>87 %</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.554862273626541</powerouthrs>
		<powerouttimes>1.1005935169685</powerouttimes>
		<distplan>On Track</distplan>
		<efficiency>2</efficiency>
		<costpercust>670</costpercust>
		<costperkm>15702</costperkm>
		<cumenergy>0.355402910164589</cumenergy>
		<genconn>0</genconn>
		<genfac>100%</genfac>
		<liquidity>1.33611029965967</liquidity>
		<leverage>1.22385069647518</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0629</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Essex Powerlines Corporation</dist>
		<connections>0.905</connections>
		<appointments>0.908</appointments>
		<tele>0.736</tele>
		<firstcont>98.25%</firstcont>
		<billacc>99.90%</billacc>
		<custsurvey>81%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>NI</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.630211376525176</powerouthrs>
		<powerouttimes>0.503351091252793</powerouttimes>
		<distplan>94.16%</distplan>
		<efficiency>2</efficiency>
		<costpercust>541</costpercust>
		<costperkm>35323</costperkm>
		<cumenergy>0.400862451842186</cumenergy>
		<genconn>100%</genconn>
		<genfac>94.74%</genfac>
		<liquidity>0.701313325066309</liquidity>
		<leverage>0.90563979300245</leverage>
		<profitdeemed>0.0985</profitdeemed>
		<profitachieved>0.0725</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Festival Hydro Inc.</dist>
		<connections>0.997</connections>
		<appointments>1</appointments>
		<tele>0.87</tele>
		<firstcont>99.99</firstcont>
		<billacc>99.97%</billacc>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.31639600625526</powerouthrs>
		<powerouttimes>0.926741248646698</powerouttimes>
		<distplan>97.2%</distplan>
		<efficiency>4</efficiency>
		<costpercust>645</costpercust>
		<costperkm>51669</costperkm>
		<cumenergy>0.471252085198574</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.545133422128998</liquidity>
		<leverage>1.32182939150043</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0737</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Fort Frances Power Corporation</dist>
		<connections>1</connections>
		<appointments>0.989</appointments>
		<tele>0.977</tele>
		<firstcont>99.4</firstcont>
		<billacc>98.26%</billacc>
		<custsurvey>88.5</custsurvey>
		<publicawareness>0.7935</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.332925415087987</powerouthrs>
		<powerouttimes>0.349758722592436</powerouttimes>
		<distplan>97.5</distplan>
		<efficiency>3</efficiency>
		<costpercust>688</costpercust>
		<costperkm>32194</costperkm>
		<cumenergy>0.204959448135052</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>4.48210987670295</liquidity>
		<leverage>0</leverage>
		<profitdeemed>0</profitdeemed>
		<profitachieved>-0.0252</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Greater Sudbury Hydro Inc.</dist>
		<connections>0.994</connections>
		<appointments>1</appointments>
		<tele>0.669</tele>
		<firstcont>84%</firstcont>
		<billacc>99.92%</billacc>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.7368</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.19098477752369</powerouthrs>
		<powerouttimes>0.868952741772589</powerouttimes>
		<distplan>96.40%</distplan>
		<efficiency>4</efficiency>
		<costpercust>648</costpercust>
		<costperkm>30649</costperkm>
		<cumenergy>0.558821534962761</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.471291601598</liquidity>
		<leverage>1.99389214797418</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.1017</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Grimsby Power Incorporated</dist>
		<connections>0.986</connections>
		<appointments>1</appointments>
		<tele>0.7</tele>
		<firstcont>99.94%</firstcont>
		<billacc>99.98%</billacc>
		<custsurvey>75.4%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.545211498779464</powerouthrs>
		<powerouttimes>0.692869235626303</powerouttimes>
		<distplan>88.73%</distplan>
		<efficiency>2</efficiency>
		<costpercust>611</costpercust>
		<costperkm>27753</costperkm>
		<cumenergy>0.486902865212275</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>0.597794982975662</liquidity>
		<leverage>1.59511871630087</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0239</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Guelph Hydro Electric Systems Inc.</dist>
		<connections>0.995</connections>
		<appointments>0.997</appointments>
		<tele>0.867</tele>
		<firstcont>99.98%</firstcont>
		<billacc>99.95%</billacc>
		<custsurvey>89%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.70630551851932</powerouthrs>
		<powerouttimes>1.33766930090938</powerouttimes>
		<distplan>102.20%</distplan>
		<efficiency>3</efficiency>
		<costpercust>624</costpercust>
		<costperkm>30014</costperkm>
		<cumenergy>0.698752656388396</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>2.372618347725</liquidity>
		<leverage>1.40826330686721</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.1058</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Halton Hills Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.944</tele>
		<firstcont>99.98%</firstcont>
		<billacc>99.84%</billacc>
		<custsurvey>88%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.38041296185733</powerouthrs>
		<powerouttimes>1.64870415708881</powerouttimes>
		<distplan>Over budget</distplan>
		<efficiency>1</efficiency>
		<costpercust>770</costpercust>
		<costperkm>10557</costperkm>
		<cumenergy>0.338368205882036</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.909437903706116</liquidity>
		<leverage>1.13061653017867</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0676</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hearst Power Distribution Company Limited</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.873</tele>
		<firstcont>99.74%</firstcont>
		<billacc>99.91%</billacc>
		<custsurvey>96% Good</custsurvey>
		<publicawareness>0.76</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.19328034682081</powerouthrs>
		<powerouttimes>1.27131502890173</powerouttimes>
		<distplan>Established</distplan>
		<efficiency>2</efficiency>
		<costpercust>516</costpercust>
		<costperkm>20531</costperkm>
		<cumenergy>1.54508217032647</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>2.14088290610651</liquidity>
		<leverage>0.393434083702674</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0833</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Horizon Utilities Corporation</dist>
		<connections>0.997</connections>
		<appointments>0.993</appointments>
		<tele>0.822</tele>
		<firstcont>88%</firstcont>
		<billacc>99.90%</billacc>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>3</genincidents>
		<rateperkm>0.854</rateperkm>
		<powerouthrs>1.10225930710681</powerouthrs>
		<powerouttimes>1.57206644237725</powerouttimes>
		<distplan>105.56%</distplan>
		<efficiency>3</efficiency>
		<costpercust>553</costpercust>
		<costperkm>38341</costperkm>
		<cumenergy>0.37021764986675</cumenergy>
		<genconn>88.89%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.92557624069597</liquidity>
		<leverage>0.894663417237902</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0985</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro 2000 Inc.</dist>
		<connections>1</connections>
		<appointments>0.988</appointments>
		<tele>0.997</tele>
		<firstcont>92%</firstcont>
		<billacc>99.93%</billacc>
		<custsurvey>98%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0</powerouthrs>
		<powerouttimes>0</powerouttimes>
		<distplan>45%</distplan>
		<efficiency>2</efficiency>
		<costpercust>496</costpercust>
		<costperkm>31348</costperkm>
		<cumenergy>0.251518825832187</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.07360458006415</liquidity>
		<leverage>0.0136114120140562</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0525</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro Hawkesbury Inc.</dist>
		<connections>1</connections>
		<appointments>0.952</appointments>
		<tele>1</tele>
		<firstcont>94%</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.39333540502844</powerouthrs>
		<powerouttimes>0.603622093905603</powerouttimes>
		<distplan>In progress</distplan>
		<efficiency>1</efficiency>
		<costpercust>271</costpercust>
		<costperkm>21694</costperkm>
		<cumenergy>0.319249260727767</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>0.895973670143218</liquidity>
		<leverage>0.469207376531081</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1763</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro One Brampton Networks Inc.</dist>
		<connections>0.998</connections>
		<appointments>0.999</appointments>
		<tele>0.823</tele>
		<firstcont>99.9645</firstcont>
		<billacc>99.64%</billacc>
		<custsurvey>Excellent</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.405817389981642</powerouthrs>
		<powerouttimes>0.693119924682914</powerouttimes>
		<distplan>95%</distplan>
		<efficiency>3</efficiency>
		<costpercust>634</costpercust>
		<costperkm>29862</costperkm>
		<cumenergy>0.303852601859044</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.56598456572884</liquidity>
		<leverage>0.904553391140368</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.073</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro One Networks Inc.</dist>
		<connections>0.986</connections>
		<appointments>0.995</appointments>
		<tele>0.742</tele>
		<firstcont>82</firstcont>
		<billacc>99.04%</billacc>
		<custsurvey>84</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>NI</ontreg>
		<genincidents>11</genincidents>
		<rateperkm>0.091</rateperkm>
		<powerouthrs>7.83274904916192</powerouthrs>
		<powerouttimes>2.47338219168281</powerouttimes>
		<distplan>105</distplan>
		<efficiency>4</efficiency>
		<costpercust>987</costpercust>
		<costperkm>10551</costperkm>
		<cumenergy>0.424975923508394</cumenergy>
		<genconn>100%</genconn>
		<genfac>99.22%</genfac>
		<liquidity>0.803801322555315</liquidity>
		<leverage>1.4580945842304</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0841</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro One Remote Communities Inc.</dist>
		<connections>1</connections>
		<appointments/>
		<tele>1</tele>
		<firstcont>100</firstcont>
		<billacc>97.27%</billacc>
		<custsurvey>91</custsurvey>
		<publicawareness>0.6925</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>9.11159299791016</powerouthrs>
		<powerouttimes>4.94539448551718</powerouttimes>
		<distplan>160</distplan>
		<efficiency>0</efficiency>
		<costpercust>0</costpercust>
		<costperkm>0</costperkm>
		<cumenergy/>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.97615641015859</liquidity>
		<leverage/>
		<profitdeemed/>
		<profitachieved/>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro Ottawa Limited</dist>
		<connections>1</connections>
		<appointments>0.996</appointments>
		<tele>0.838</tele>
		<firstcont>84.99%</firstcont>
		<billacc>99.90%</billacc>
		<custsurvey>81%</custsurvey>
		<publicawareness>0.7</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.00125249001317</powerouthrs>
		<powerouttimes>0.73746152920632</powerouttimes>
		<distplan>94%</distplan>
		<efficiency>4</efficiency>
		<costpercust>664</costpercust>
		<costperkm>38794</costperkm>
		<cumenergy>0.334691715593093</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.19017300056204</liquidity>
		<leverage>1.65473059790436</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.098</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Innpower Corporation</dist>
		<connections>0.948</connections>
		<appointments>0.956</appointments>
		<tele>0.801</tele>
		<firstcont>99.4</firstcont>
		<billacc>97.97%</billacc>
		<custsurvey>B</custsurvey>
		<publicawareness>0.86</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.12360857834642</powerouthrs>
		<powerouttimes>1.35152678253223</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>904</costpercust>
		<costperkm>17640</costperkm>
		<cumenergy>0.34924497039178</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>0.801976438182114</liquidity>
		<leverage>1.7769465874905</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.039</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kenora Hydro Electric Corporation Ltd.</dist>
		<connections>1</connections>
		<appointments>0.991</appointments>
		<tele>0.99</tele>
		<firstcont>99%</firstcont>
		<billacc>99.94%</billacc>
		<custsurvey>76%</custsurvey>
		<publicawareness>0.79</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.594588579879108</powerouthrs>
		<powerouttimes>0.428039167827248</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>578</costpercust>
		<costperkm>32835</costperkm>
		<cumenergy>0.422158298717868</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>3.23919013941795</liquidity>
		<leverage>0.651845124076714</leverage>
		<profitdeemed>0.0958</profitdeemed>
		<profitachieved>0.0542</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kingston Hydro Corporation</dist>
		<connections>1</connections>
		<appointments>0.979</appointments>
		<tele>0.66</tele>
		<firstcont>98.86%</firstcont>
		<billacc>99.75%</billacc>
		<custsurvey>'A'</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.31975457221283</powerouthrs>
		<powerouttimes>0.586273764230805</powerouttimes>
		<distplan>On track</distplan>
		<efficiency>3</efficiency>
		<costpercust>531</costpercust>
		<costperkm>43562</costperkm>
		<cumenergy>0.234009389432992</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.10114111101083</liquidity>
		<leverage>1.35947403653795</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0643</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kitchener-Wilmot Hydro Inc.</dist>
		<connections>0.925</connections>
		<appointments>0.975</appointments>
		<tele>0.784</tele>
		<firstcont>99.4</firstcont>
		<billacc>100.00%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.11310899449421</powerouthrs>
		<powerouttimes>1.11047586782045</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>2</efficiency>
		<costpercust>494</costpercust>
		<costperkm>23866</costperkm>
		<cumenergy>0.366140305365494</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.96089975383676</liquidity>
		<leverage>0.572040266689967</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1018</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Lakefront Utilities Inc.</dist>
		<connections>0.985</connections>
		<appointments>0.99</appointments>
		<tele>0.912</tele>
		<firstcont>99.96%</firstcont>
		<billacc>99.89%</billacc>
		<custsurvey>76.10%</custsurvey>
		<publicawareness>0.79</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.67317906232018</powerouthrs>
		<powerouttimes>0.370861881454667</powerouttimes>
		<distplan>Complete</distplan>
		<efficiency>2</efficiency>
		<costpercust>471</costpercust>
		<costperkm>25055</costperkm>
		<cumenergy>0.304496842292913</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.25304848154647</liquidity>
		<leverage>1.03440752207897</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0772</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Lakeland Power Distribution Ltd.</dist>
		<connections>0.992</connections>
		<appointments>0.986</appointments>
		<tele>0.906</tele>
		<firstcont>99.98</firstcont>
		<billacc>99.86%</billacc>
		<custsurvey>74.5%</custsurvey>
		<publicawareness>0.825</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.00857839668306</powerouthrs>
		<powerouttimes>0.728225130024239</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>734</costpercust>
		<costperkm>27559</costperkm>
		<cumenergy>0.484242896078924</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.70134629126234</liquidity>
		<leverage>1.12761043136779</leverage>
		<profitdeemed>0.0908</profitdeemed>
		<profitachieved>0.1086</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>London Hydro Inc.</dist>
		<connections>0.966</connections>
		<appointments>0.999</appointments>
		<tele>0.67</tele>
		<firstcont>99.5%</firstcont>
		<billacc>99.71%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>2</genincidents>
		<rateperkm>0.698</rateperkm>
		<powerouthrs>0.967390004685808</powerouthrs>
		<powerouttimes>1.02648289679911</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>2</efficiency>
		<costpercust>521</costpercust>
		<costperkm>28281</costperkm>
		<cumenergy>0.32448743153275</cumenergy>
		<genconn>85.71%</genconn>
		<genfac>91.43%</genfac>
		<liquidity>1.30842480132941</liquidity>
		<leverage>0.737026980840581</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0599</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Midland Power Utility Corporation</dist>
		<connections>1</connections>
		<appointments>0.994</appointments>
		<tele>0.999</tele>
		<firstcont>98.1</firstcont>
		<billacc>75.61%</billacc>
		<custsurvey>80.8</custsurvey>
		<publicawareness>0.846</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.678026846029146</powerouthrs>
		<powerouttimes>0.695112955855327</powerouttimes>
		<distplan>93.75</distplan>
		<efficiency>4</efficiency>
		<costpercust>679</costpercust>
		<costperkm>36614</costperkm>
		<cumenergy>0.513859261857128</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.03892624119564</liquidity>
		<leverage>0.500167940295413</leverage>
		<profitdeemed>0.0893</profitdeemed>
		<profitachieved>0.0636</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Milton Hydro Distribution Inc.</dist>
		<connections>0.996</connections>
		<appointments>1</appointments>
		<tele>0.967</tele>
		<firstcont>89.5</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.7422079406472</powerouthrs>
		<powerouttimes>0.594568066017857</powerouttimes>
		<distplan>on track</distplan>
		<efficiency>3</efficiency>
		<costpercust>723</costpercust>
		<costperkm>25334</costperkm>
		<cumenergy>0.371840587994987</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>2.010624387092</liquidity>
		<leverage>1.33382478645973</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0987</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Newmarket-Tay Power Distribution Ltd.</dist>
		<connections>1</connections>
		<appointments>0.998</appointments>
		<tele>0.818</tele>
		<firstcont>90%</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.41804291470014</powerouthrs>
		<powerouttimes>0.571914645104093</powerouttimes>
		<distplan>100%</distplan>
		<efficiency>2</efficiency>
		<costpercust>600</costpercust>
		<costperkm>24893</costperkm>
		<cumenergy>0.386907780111643</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>2.73568064384901</liquidity>
		<leverage>0.668058936508866</leverage>
		<profitdeemed>0.0966</profitdeemed>
		<profitachieved>0.0801</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Niagara Peninsula Energy Inc.</dist>
		<connections>0.927</connections>
		<appointments>0.998</appointments>
		<tele>0.83</tele>
		<firstcont>94%</firstcont>
		<billacc>99.74%</billacc>
		<custsurvey>86%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.51967092739203</powerouthrs>
		<powerouttimes>1.37892408222493</powerouttimes>
		<distplan>95.97%</distplan>
		<efficiency>3</efficiency>
		<costpercust>747</costpercust>
		<costperkm>19980</costperkm>
		<cumenergy>0.340311610286031</cumenergy>
		<genconn>66.67%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.84486070597998</liquidity>
		<leverage>1.01270117109284</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0686</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Niagara-On-The-Lake Hydro Inc.</dist>
		<connections>0.989</connections>
		<appointments>0.995</appointments>
		<tele>0.862</tele>
		<firstcont>10</firstcont>
		<billacc>99.83%</billacc>
		<custsurvey>87.00</custsurvey>
		<publicawareness>0.815</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.33672281266962</powerouthrs>
		<powerouttimes>1.02559837515102</powerouttimes>
		<distplan>112.06</distplan>
		<efficiency>3</efficiency>
		<costpercust>717</costpercust>
		<costperkm>19878</costperkm>
		<cumenergy>0.545296398468611</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>0.879202340484542</liquidity>
		<leverage>0.692894944397046</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0744</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>North Bay Hydro Distribution Limited</dist>
		<connections>1</connections>
		<appointments>0.999</appointments>
		<tele>0.836</tele>
		<firstcont>14</firstcont>
		<billacc>99.70%</billacc>
		<custsurvey>85%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.29470924701999</powerouthrs>
		<powerouttimes>1.98234845398143</powerouttimes>
		<distplan>106%</distplan>
		<efficiency>3</efficiency>
		<costpercust>659</costpercust>
		<costperkm>27680</costperkm>
		<cumenergy>1.02044481025193</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>2.08825686447533</liquidity>
		<leverage>0.952247435016084</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0901</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Northern Ontario Wires Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>1</tele>
		<firstcont>100%</firstcont>
		<billacc>99.87%</billacc>
		<custsurvey>88%</custsurvey>
		<publicawareness>0.8014</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>3.46122043988755</powerouthrs>
		<powerouttimes>1.89995038862246</powerouttimes>
		<distplan>Excellent</distplan>
		<efficiency>1</efficiency>
		<costpercust>645</costpercust>
		<costperkm>10470</costperkm>
		<cumenergy>0.337714461352176</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.2335485007908</liquidity>
		<leverage>1.42221737610529</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0344</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Oakville Hydro Electricity Distribution Inc.</dist>
		<connections>0.812</connections>
		<appointments>1</appointments>
		<tele>0.728</tele>
		<firstcont>96.8</firstcont>
		<billacc>99.92%</billacc>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.502880486518992</powerouthrs>
		<powerouttimes>0.897454738067091</powerouttimes>
		<distplan>On Track</distplan>
		<efficiency>3</efficiency>
		<costpercust>720</costpercust>
		<costperkm>26324</costperkm>
		<cumenergy>0.424111157459558</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.48488459207019</liquidity>
		<leverage>1.05872559314176</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1071</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Orangeville Hydro Limited</dist>
		<connections>1</connections>
		<appointments>0.998</appointments>
		<tele>0.995</tele>
		<firstcont>3</firstcont>
		<billacc>99.96%</billacc>
		<custsurvey>74.8</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.685583587307167</powerouthrs>
		<powerouttimes>1.12362077424051</powerouttimes>
		<distplan>100</distplan>
		<efficiency>3</efficiency>
		<costpercust>575</costpercust>
		<costperkm>31963</costperkm>
		<cumenergy>0.407757296536027</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.58048202347604</liquidity>
		<leverage>1.06481531877502</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0868</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Orillia Power Distribution Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.966</tele>
		<firstcont>99.93%</firstcont>
		<billacc>99.98%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.516294717987726</powerouthrs>
		<powerouttimes>1.1005736772728</powerouttimes>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>658</costpercust>
		<costperkm>37337</costperkm>
		<cumenergy>0.236258165185135</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.74667349671764</liquidity>
		<leverage>1.19195420764977</leverage>
		<profitdeemed>0.0985</profitdeemed>
		<profitachieved>-0.0159</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Oshawa PUC Networks Inc.</dist>
		<connections>0.926</connections>
		<appointments>1</appointments>
		<tele>0.737</tele>
		<firstcont>521</firstcont>
		<billacc>99.94%</billacc>
		<custsurvey>92%satisfied</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.61229709960843</powerouthrs>
		<powerouttimes>2.06319367187295</powerouttimes>
		<distplan>97%</distplan>
		<efficiency>2</efficiency>
		<costpercust>546</costpercust>
		<costperkm>31962</costperkm>
		<cumenergy>0.242130315651009</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.15743723958916</liquidity>
		<leverage>1.03517846111082</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0997</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Ottawa River Power Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.999</tele>
		<firstcont>98.2</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>78.8% </custsurvey>
		<publicawareness>0.822</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.54864571078622</powerouthrs>
		<powerouttimes>0.835655358790581</powerouttimes>
		<distplan>Implemented</distplan>
		<efficiency>3</efficiency>
		<costpercust>487</costpercust>
		<costperkm>30052</costperkm>
		<cumenergy>0.544577020677853</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.52866066657746</liquidity>
		<leverage>0.723422142089521</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0632</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Peterborough Distribution Incorporated</dist>
		<connections>0.97</connections>
		<appointments>0.996</appointments>
		<tele>0.846</tele>
		<firstcont>0</firstcont>
		<billacc>99.78%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.01399232629528</powerouthrs>
		<powerouttimes>2.33831071400861</powerouttimes>
		<distplan>77%</distplan>
		<efficiency>4</efficiency>
		<costpercust>604</costpercust>
		<costperkm>39184</costperkm>
		<cumenergy>0.283033635373906</cumenergy>
		<genconn>100%</genconn>
		<genfac>85%</genfac>
		<liquidity>1.89338088248016</liquidity>
		<leverage>1.47234227394267</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0702</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>PowerStream Inc.</dist>
		<connections>0.995</connections>
		<appointments>0.992</appointments>
		<tele>0.759</tele>
		<firstcont>70.83</firstcont>
		<billacc>99.15%</billacc>
		<custsurvey>90.5</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.877750629679763</powerouthrs>
		<powerouttimes>0.931469595462879</powerouttimes>
		<distplan>91.5</distplan>
		<efficiency>3</efficiency>
		<costpercust>723</costpercust>
		<costperkm>34029</costperkm>
		<cumenergy>0.37447012879507</cumenergy>
		<genconn>89.47%</genconn>
		<genfac>92.26%</genfac>
		<liquidity>0.7562521178077</liquidity>
		<leverage>1.64293909123318</leverage>
		<profitdeemed>0.0893</profitdeemed>
		<profitachieved>0.0789</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>PUC Distribution Inc.</dist>
		<connections>0.989</connections>
		<appointments>0.983</appointments>
		<tele>0.813</tele>
		<firstcont>99.58%</firstcont>
		<billacc>99.97%</billacc>
		<custsurvey>80%</custsurvey>
		<publicawareness>0.86</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.49265353003476</powerouthrs>
		<powerouttimes>1.40938856486523</powerouttimes>
		<distplan>In progress</distplan>
		<efficiency>4</efficiency>
		<costpercust>695</costpercust>
		<costperkm>31314</costperkm>
		<cumenergy>0.529743008246852</cumenergy>
		<genconn>100%</genconn>
		<genfac/>
		<liquidity>1.52386376958881</liquidity>
		<leverage>2.336041168927</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0098</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Renfrew Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.957</appointments>
		<tele>0.919</tele>
		<firstcont>99.05%</firstcont>
		<billacc>99.43%</billacc>
		<custsurvey>83.6%</custsurvey>
		<publicawareness>0.826</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.335587734560626</powerouthrs>
		<powerouttimes>0.276655254345101</powerouttimes>
		<distplan>85%</distplan>
		<efficiency>4</efficiency>
		<costpercust>599</costpercust>
		<costperkm>32010</costperkm>
		<cumenergy>0.192377372613131</cumenergy>
		<genconn>100%</genconn>
		<genfac/>
		<liquidity>1.3029464035123</liquidity>
		<leverage>0.755906381518344</leverage>
		<profitdeemed>0.0985</profitdeemed>
		<profitachieved>-0.0153</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Rideau St. Lawrence Distribution Inc.</dist>
		<connections>1</connections>
		<appointments>0.945</appointments>
		<tele>0.742</tele>
		<firstcont>98.8%</firstcont>
		<billacc>99.70%</billacc>
		<custsurvey>B</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.0083646295664</powerouthrs>
		<powerouttimes>0.384090133151246</powerouttimes>
		<distplan>83%</distplan>
		<efficiency>3</efficiency>
		<costpercust>543</costpercust>
		<costperkm>29810</costperkm>
		<cumenergy>0.402506085662477</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.03473765370969</liquidity>
		<leverage>0.443733232451692</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0103</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Sioux Lookout Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.917</appointments>
		<tele>0.94</tele>
		<firstcont>100%</firstcont>
		<billacc>99.84%</billacc>
		<custsurvey>82.99</custsurvey>
		<publicawareness>0.79</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.671040058407327</powerouthrs>
		<powerouttimes>0.568326193467112</powerouttimes>
		<distplan>Stage 5</distplan>
		<efficiency>3</efficiency>
		<costpercust>852</costpercust>
		<costperkm>8644</costperkm>
		<cumenergy>0.278436170187897</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>0.928056763834637</liquidity>
		<leverage>0.513617864556759</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0516</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>St. Thomas Energy Inc.</dist>
		<connections>0.984</connections>
		<appointments>1</appointments>
		<tele>0.758</tele>
		<firstcont>100%</firstcont>
		<billacc>99.95%</billacc>
		<custsurvey>B+, A, A</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.03865829855169</powerouthrs>
		<powerouttimes>1.48670128280252</powerouttimes>
		<distplan>99.58%</distplan>
		<efficiency>3</efficiency>
		<costpercust>534</costpercust>
		<costperkm>38032</costperkm>
		<cumenergy>0.372726781252082</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.35502748694316</liquidity>
		<leverage>0.64812005573368</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.1065</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Thunder Bay Hydro Electricity Distribution Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.933</tele>
		<firstcont>A+</firstcont>
		<billacc>99.81%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.68713192709042</powerouthrs>
		<powerouttimes>2.70440548538653</powerouttimes>
		<distplan>On Track</distplan>
		<efficiency>3</efficiency>
		<costpercust>666</costpercust>
		<costperkm>28444</costperkm>
		<cumenergy>0.530668719102183</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.41464146871817</liquidity>
		<leverage>0.729288579396635</leverage>
		<profitdeemed>0.07</profitdeemed>
		<profitachieved>0.014</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Tillsonburg Hydro Inc.</dist>
		<connections>0.976</connections>
		<appointments>0.983</appointments>
		<tele>0.64</tele>
		<firstcont>96.87%</firstcont>
		<billacc>98.91%</billacc>
		<custsurvey>satisfied</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>NC</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.41755453941762</powerouthrs>
		<powerouttimes>0.77483247529423</powerouttimes>
		<distplan>In progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>672</costpercust>
		<costperkm>35562</costperkm>
		<cumenergy>0.247873627524403</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>2.03055197762396</liquidity>
		<leverage>0.0241183496857196</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0575</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Toronto Hydro-Electric System Limited</dist>
		<connections>0.977</connections>
		<appointments>0.995</appointments>
		<tele>0.647</tele>
		<firstcont>86%</firstcont>
		<billacc>98.86%</billacc>
		<custsurvey>83%</custsurvey>
		<publicawareness>0.71</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.905510001905818</powerouthrs>
		<powerouttimes>1.27547963720967</powerouttimes>
		<distplan>113% </distplan>
		<efficiency>5</efficiency>
		<costpercust>1044</costpercust>
		<costperkm>27819</costperkm>
		<cumenergy>0.345774369389805</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.607092509565056</liquidity>
		<leverage>1.44936368124903</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.1218</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Veridian Connections Inc.</dist>
		<connections>0.981</connections>
		<appointments>1</appointments>
		<tele>0.762</tele>
		<firstcont>82.7%</firstcont>
		<billacc>99.85%</billacc>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.445</rateperkm>
		<powerouthrs>1.24005840529351</powerouthrs>
		<powerouttimes>1.29392073155438</powerouttimes>
		<distplan>98.81%</distplan>
		<efficiency>3</efficiency>
		<costpercust>593</costpercust>
		<costperkm>27593</costperkm>
		<cumenergy>0.242615380671378</cumenergy>
		<genconn>100%</genconn>
		<genfac>97.37%</genfac>
		<liquidity>1.62047727737928</liquidity>
		<leverage>1.33697004870307</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0928</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Wasaga Distribution Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>1</tele>
		<firstcont>.0658</firstcont>
		<billacc>99.84%</billacc>
		<custsurvey>82.2%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>1.11394122079879</powerouthrs>
		<powerouttimes>1.35192162773173</powerouttimes>
		<distplan>Completed</distplan>
		<efficiency>1</efficiency>
		<costpercust>430</costpercust>
		<costperkm>19855</costperkm>
		<cumenergy>0.565932538209545</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>2.33317306188746</liquidity>
		<leverage>0.315035704726102</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0843</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Waterloo North Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.981</appointments>
		<tele>0.867</tele>
		<firstcont>99.92%</firstcont>
		<billacc>99.73%</billacc>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.618</rateperkm>
		<powerouthrs>0.706435744345337</powerouthrs>
		<powerouttimes>1.14735893096997</powerouttimes>
		<distplan>23.05%</distplan>
		<efficiency>4</efficiency>
		<costpercust>809</costpercust>
		<costperkm>28094</costperkm>
		<cumenergy>0.296922043926804</cumenergy>
		<genconn>80%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.01471799889298</liquidity>
		<leverage>1.2316968907138</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.1013</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Welland Hydro-Electric System Corp.</dist>
		<connections>1</connections>
		<appointments>0.985</appointments>
		<tele>0.986</tele>
		<firstcont>75%</firstcont>
		<billacc>99.99%</billacc>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.208</rateperkm>
		<powerouthrs>0.627751468805659</powerouthrs>
		<powerouttimes>0.71911353297278</powerouttimes>
		<distplan>Completed</distplan>
		<efficiency>2</efficiency>
		<costpercust>510</costpercust>
		<costperkm>24268</costperkm>
		<cumenergy>0.210834887208967</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>1.45830509290906</liquidity>
		<leverage>0.823555403659141</leverage>
		<profitdeemed>0.0893</profitdeemed>
		<profitachieved>0.0663</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Wellington North Power Inc.</dist>
		<connections>1</connections>
		<appointments>0.99</appointments>
		<tele>0.999</tele>
		<firstcont>99.84%</firstcont>
		<billacc>99.47%</billacc>
		<custsurvey>79.0%</custsurvey>
		<publicawareness>0.824</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.337216840566332</powerouthrs>
		<powerouttimes>0.201689819199484</powerouttimes>
		<distplan>24%</distplan>
		<efficiency>4</efficiency>
		<costpercust>838</costpercust>
		<costperkm>39667</costperkm>
		<cumenergy>0.223882150066865</cumenergy>
		<genconn/>
		<genfac>100%</genfac>
		<liquidity>1.06440640844009</liquidity>
		<leverage>1.55541143048054</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.1068</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>West Coast Huron Energy Inc.</dist>
		<connections>1</connections>
		<appointments>0.977</appointments>
		<tele>0.985</tele>
		<firstcont>99</firstcont>
		<billacc>99.81%</billacc>
		<custsurvey>77</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.147175805126797</powerouthrs>
		<powerouttimes>0.0627051845786704</powerouttimes>
		<distplan>82</distplan>
		<efficiency>5</efficiency>
		<costpercust>848</costpercust>
		<costperkm>53239</costperkm>
		<cumenergy>0.311080007545057</cumenergy>
		<genconn>100%</genconn>
		<genfac>100%</genfac>
		<liquidity>0.928231010975573</liquidity>
		<leverage>0.924441570102822</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0413</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Westario Power Inc.</dist>
		<connections>0.921</connections>
		<appointments>1</appointments>
		<tele>0.829</tele>
		<firstcont>98.86%</firstcont>
		<billacc>99.96%</billacc>
		<custsurvey>88%</custsurvey>
		<publicawareness>0.86</publicawareness>
		<ontreg>NI</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>2.40727570526497</powerouthrs>
		<powerouttimes>0.625331350617444</powerouttimes>
		<distplan>In process</distplan>
		<efficiency>3</efficiency>
		<costpercust>578</costpercust>
		<costperkm>25258</costperkm>
		<cumenergy>0.375483253557101</cumenergy>
		<genconn/>
		<genfac/>
		<liquidity>1.12478362468166</liquidity>
		<leverage>0.612156428048833</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0666</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Whitby Hydro Electric Corporation</dist>
		<connections>0.951</connections>
		<appointments>0.996</appointments>
		<tele>0.806</tele>
		<firstcont>99.59</firstcont>
		<billacc>99.81%</billacc>
		<custsurvey>A</custsurvey>
		<publicawareness>0.789</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouthrs>0.986164939817142</powerouthrs>
		<powerouttimes>1.23033409597455</powerouttimes>
		<distplan>97.95</distplan>
		<efficiency>3</efficiency>
		<costpercust>689</costpercust>
		<costperkm>26552</costperkm>
		<cumenergy>0.292205524270275</cumenergy>
		<genconn/>
		<genfac>78.95%</genfac>
		<liquidity>1.23593869914704</liquidity>
		<leverage>0.659659637486894</leverage>
		<profitdeemed>0.0966</profitdeemed>
		<profitachieved>0.0994</profitachieved>
	</PerformanceItemRow>