<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<PerformanceItemsTable>
	<PerformanceItemRow>
		<dist>Alectra Utilities Corporation</dist>
		<connections>0.947</connections>
		<appointments>0.9962</appointments>
		<tele>0.7798</tele>
		<billacc>100</billacc>
		<firstcont>85.4%</firstcont>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>13</genincidents>
		<rateperkm>0.657</rateperkm>
		<powerouttimes>1.36811491819761</powerouttimes>
		<powerouthrs>1.08371382472376</powerouthrs>
		<distplan>88.5%</distplan>
		<efficiency>3</efficiency>
		<costpercust>682</costpercust>
		<costperkm>33949</costperkm>
		<cumenergy>0.810042581834249</cumenergy>
		<genconn>1</genconn>
		<genfac>0.9674</genfac>
		<liquidity>0.936397393752083</liquidity>
		<leverage>1.1552328584725</leverage>
		<profitdeemed>0.0894</profitdeemed>
		<profitachieved>0.0766</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Algoma Power Inc.</dist>
		<connections>0.9863</connections>
		<appointments>1</appointments>
		<tele>0.8606</tele>
		<billacc>100</billacc>
		<firstcont>99.97%</firstcont>
		<custsurvey>93%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.19720648439291</powerouttimes>
		<powerouthrs>7.51404045457916</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>5</efficiency>
		<costpercust>2182</costpercust>
		<costperkm>13831</costperkm>
		<cumenergy>0.741866772807923</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.06791344831659</liquidity>
		<leverage>1.41684975412538</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0822</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Atikokan Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>N/A</appointments>
		<tele>1</tele>
		<billacc>100</billacc>
		<firstcont>100%</firstcont>
		<custsurvey>100%</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.604493667791306</powerouttimes>
		<powerouthrs>1.16559092464916</powerouthrs>
		<distplan>On Target</distplan>
		<efficiency>4</efficiency>
		<costpercust>1024</costpercust>
		<costperkm>18212</costperkm>
		<cumenergy>0.709617712758255</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.3672632463354</liquidity>
		<leverage>0.191041690992546</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1186</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Bluewater Power Distribution Corporation</dist>
		<connections>0.9689</connections>
		<appointments>0.9972</appointments>
		<tele>0.8231</tele>
		<billacc>100</billacc>
		<firstcont>99.99%</firstcont>
		<custsurvey>74.40%</custsurvey>
		<publicawareness>0.86</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.673766547866</powerouttimes>
		<powerouthrs>1.59695038757121</powerouthrs>
		<distplan>At Budget</distplan>
		<efficiency>3</efficiency>
		<costpercust>730</costpercust>
		<costperkm>34186</costperkm>
		<cumenergy>0.555672085107193</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.36020505303765</liquidity>
		<leverage>0.669196448976828</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.1186</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Brantford Power Inc.</dist>
		<connections>0.9952</connections>
		<appointments>1</appointments>
		<tele>0.8524</tele>
		<billacc>100</billacc>
		<firstcont>86.84</firstcont>
		<custsurvey>95%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.89307227021793</powerouttimes>
		<powerouthrs>0.683945121414469</powerouthrs>
		<distplan>101.9% </distplan>
		<efficiency>3</efficiency>
		<costpercust>527</costpercust>
		<costperkm>41221</costperkm>
		<cumenergy>0.701248075530913</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>2.1716702323579</liquidity>
		<leverage>0.834547355646756</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.079</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Burlington Hydro Inc.</dist>
		<connections>0.9831</connections>
		<appointments>0.9981</appointments>
		<tele>0.8328</tele>
		<billacc>100</billacc>
		<firstcont>91</firstcont>
		<custsurvey>94</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.850660435512188</powerouttimes>
		<powerouthrs>1.43725333017687</powerouthrs>
		<distplan>On Track</distplan>
		<efficiency>2</efficiency>
		<costpercust>627</costpercust>
		<costperkm>27766</costperkm>
		<cumenergy>0.813778645406936</cumenergy>
		<genconn>1</genconn>
		<genfac>0.9737</genfac>
		<liquidity>2.50450912024785</liquidity>
		<leverage>0.801391827634231</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0703</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Canadian Niagara Power Inc.</dist>
		<connections>0.904</connections>
		<appointments>1</appointments>
		<tele>0.8098</tele>
		<billacc>100</billacc>
		<firstcont>99.84%</firstcont>
		<custsurvey>91%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.14095628765543</powerouttimes>
		<powerouthrs>2.44765201042601</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>4</efficiency>
		<costpercust>867</costpercust>
		<costperkm>24425</costperkm>
		<cumenergy>1.00578731002221</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.444449752810013</liquidity>
		<leverage>3.02505022087542</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0658</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Centre Wellington Hydro Ltd.</dist>
		<connections>0.9953</connections>
		<appointments>0.9951</appointments>
		<tele>0.9788</tele>
		<billacc>100</billacc>
		<firstcont>99.72</firstcont>
		<custsurvey>79.9</custsurvey>
		<publicawareness>0.856</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.697157315373831</powerouttimes>
		<powerouthrs>0.307074406710282</powerouthrs>
		<distplan>100</distplan>
		<efficiency>3</efficiency>
		<costpercust>710</costpercust>
		<costperkm>31963</costperkm>
		<cumenergy>0.856691153865778</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.51757180308992</liquidity>
		<leverage>1.06882263301426</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0714</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Chapleau Public Utilities Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9652</tele>
		<billacc>100</billacc>
		<firstcont>100</firstcont>
		<custsurvey>95</custsurvey>
		<publicawareness>0.79</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>4.48929663608563</powerouttimes>
		<powerouthrs>12.5145769622834</powerouthrs>
		<distplan>Complete</distplan>
		<efficiency>4</efficiency>
		<costpercust>807</costpercust>
		<costperkm>32515</costperkm>
		<cumenergy>0.789621947577028</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>2.90353308076827</liquidity>
		<leverage>0</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>-0.0919</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Cooperative Hydro Embrun Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9426</tele>
		<billacc>99</billacc>
		<firstcont>91.36%</firstcont>
		<custsurvey>86.24</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.0559888372255781</powerouttimes>
		<powerouthrs>0.599692936220841</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>1</efficiency>
		<costpercust>521</costpercust>
		<costperkm>33329</costperkm>
		<cumenergy>0.925552293845247</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.95900656763051</liquidity>
		<leverage>0.12335243100302</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0812</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>E.L.K. Energy Inc.</dist>
		<connections>0.9904</connections>
		<appointments>1</appointments>
		<tele>0.9625</tele>
		<billacc>100</billacc>
		<firstcont>Excellent</firstcont>
		<custsurvey>90% Satis</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.481569669477217</powerouttimes>
		<powerouthrs>1.62734740114687</powerouthrs>
		<distplan>In Progress</distplan>
		<efficiency>1</efficiency>
		<costpercust>402</costpercust>
		<costperkm>30795</costperkm>
		<cumenergy>0.502659575703591</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>2.51017503557594</liquidity>
		<leverage>0.34558172265268</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1617</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Energy+ Inc.</dist>
		<connections>0.991</connections>
		<appointments>0.9994</appointments>
		<tele>0.8889</tele>
		<billacc>100</billacc>
		<firstcont>99.75</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.672</rateperkm>
		<powerouttimes>1.19151474378901</powerouttimes>
		<powerouthrs>0.460850707342709</powerouthrs>
		<distplan>On Plan</distplan>
		<efficiency>2</efficiency>
		<costpercust>662</costpercust>
		<costperkm>28689</costperkm>
		<cumenergy>1.44259549350415</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.45454111154803</liquidity>
		<leverage>1.01150216050437</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0868</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Entegrus Powerlines Inc.</dist>
		<connections>0.9795</connections>
		<appointments>0.9973</appointments>
		<tele>0.7101</tele>
		<billacc>100</billacc>
		<firstcont>81</firstcont>
		<custsurvey>94</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>NI</ontreg>
		<genincidents>2</genincidents>
		<rateperkm>1.618</rateperkm>
		<powerouttimes>1.20535464878919</powerouttimes>
		<powerouthrs>1.88617718472679</powerouthrs>
		<distplan>60.41</distplan>
		<efficiency>2</efficiency>
		<costpercust>563</costpercust>
		<costperkm>26787</costperkm>
		<cumenergy>0.875216934453064</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.33548593041494</liquidity>
		<leverage>1.21870865575664</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.082</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>ENWIN Utilities Ltd.</dist>
		<connections>1</connections>
		<appointments>0.9971</appointments>
		<tele>0.7693</tele>
		<billacc>100</billacc>
		<firstcont>98.63%</firstcont>
		<custsurvey>86%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.22417616253352</powerouttimes>
		<powerouthrs>1.10775402452459</powerouthrs>
		<distplan>97.3%</distplan>
		<efficiency>3</efficiency>
		<costpercust>717</costpercust>
		<costperkm>13660</costperkm>
		<cumenergy>0.638688168086314</cumenergy>
		<genconn>0.5714</genconn>
		<genfac>1</genfac>
		<liquidity>2.23937193339093</liquidity>
		<leverage>0.778881841484879</leverage>
		<profitdeemed>0.0801</profitdeemed>
		<profitachieved>0.0435</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>EPCOR Electricity Distribution Ontario Inc.</dist>
		<connections>0.9592</connections>
		<appointments>1</appointments>
		<tele>0.8094</tele>
		<billacc>100</billacc>
		<firstcont>99.43%</firstcont>
		<custsurvey>73.0%</custsurvey>
		<publicawareness>0.833</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.199090419796869</powerouttimes>
		<powerouthrs>0.501180665992</powerouthrs>
		<distplan>55.64%</distplan>
		<efficiency>2</efficiency>
		<costpercust>536</costpercust>
		<costperkm>25755</costperkm>
		<cumenergy>1.47425250064745</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.18741031825237</liquidity>
		<leverage>1.87749744197191</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.1194</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>ERTH Power Corporation</dist>
		<connections>0.9667</connections>
		<appointments>1</appointments>
		<tele>0.94</tele>
		<billacc>99</billacc>
		<firstcont>99.89%</firstcont>
		<custsurvey>77.1%</custsurvey>
		<publicawareness>0.841</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.377743462521834</powerouttimes>
		<powerouthrs>1.10999164620409</powerouthrs>
		<distplan>101.4%</distplan>
		<efficiency>3</efficiency>
		<costpercust>678</costpercust>
		<costperkm>37085</costperkm>
		<cumenergy>0.874234644087805</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>0.869128634853923</liquidity>
		<leverage>1.37887290626415</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.1118</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Espanola Regional Hydro Distribution Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.7067</tele>
		<billacc>100</billacc>
		<firstcont>99.73</firstcont>
		<custsurvey>87%</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.0630876554443433</powerouttimes>
		<powerouthrs>0.164998483469821</powerouthrs>
		<distplan>On Track</distplan>
		<efficiency>2</efficiency>
		<costpercust>683</costpercust>
		<costperkm>16003</costperkm>
		<cumenergy>0.987001524759132</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.2163033500067</liquidity>
		<leverage>1.12083131462194</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>0.0412</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Essex Powerlines Corporation</dist>
		<connections>0.9118</connections>
		<appointments>0.9479</appointments>
		<tele>0.8767</tele>
		<billacc>98</billacc>
		<firstcont>98.52%</firstcont>
		<custsurvey>83%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.29035156314993</powerouttimes>
		<powerouthrs>1.82067450875996</powerouthrs>
		<distplan>18.80%</distplan>
		<efficiency>2</efficiency>
		<costpercust>578</costpercust>
		<costperkm>37960</costperkm>
		<cumenergy>1.19774370954606</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.667845911811362</liquidity>
		<leverage>1.10153491257219</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0811</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Festival Hydro Inc.</dist>
		<connections>0.9925</connections>
		<appointments>0.9893</appointments>
		<tele>0.8759</tele>
		<billacc>100</billacc>
		<firstcont>99.99</firstcont>
		<custsurvey>97%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.733182801768746</powerouttimes>
		<powerouthrs>0.922241038667796</powerouthrs>
		<distplan>103.6</distplan>
		<efficiency>4</efficiency>
		<costpercust>658</costpercust>
		<costperkm>53904</costperkm>
		<cumenergy>1.19550570499283</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>0.501934764221612</liquidity>
		<leverage>1.18705656218717</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.083</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Fort Frances Power Corporation</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9633</tele>
		<billacc>100</billacc>
		<firstcont>99.9%</firstcont>
		<custsurvey>89.3%</custsurvey>
		<publicawareness>0.7851</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.148491185338899</powerouttimes>
		<powerouthrs>0.17412995115281</powerouthrs>
		<distplan>127%</distplan>
		<efficiency>3</efficiency>
		<costpercust>676</costpercust>
		<costperkm>31236</costperkm>
		<cumenergy>0.662379005073313</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>6.05727922975981</liquidity>
		<leverage>0</leverage>
		<profitdeemed>0</profitdeemed>
		<profitachieved>-0.0178</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Greater Sudbury Hydro Inc.</dist>
		<connections>0.992</connections>
		<appointments>0.9989</appointments>
		<tele>0.7125</tele>
		<billacc>100</billacc>
		<firstcont>84.19</firstcont>
		<custsurvey>90%</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.40633163376807</powerouttimes>
		<powerouthrs>1.3924718310991</powerouthrs>
		<distplan>97.47%</distplan>
		<efficiency>3</efficiency>
		<costpercust>671</costpercust>
		<costperkm>31690</costperkm>
		<cumenergy>1.13621761567827</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.44903484694088</liquidity>
		<leverage>1.8551674126623</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0772</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Grimsby Power Incorporated</dist>
		<connections>0.9671</connections>
		<appointments>0.9953</appointments>
		<tele>0.8854</tele>
		<billacc>100</billacc>
		<firstcont>99.93%</firstcont>
		<custsurvey>78.8%</custsurvey>
		<publicawareness>0.826</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.17114338731502</powerouttimes>
		<powerouthrs>1.72548516817373</powerouthrs>
		<distplan>86.64%</distplan>
		<efficiency>2</efficiency>
		<costpercust>584</costpercust>
		<costperkm>9793</costperkm>
		<cumenergy>0.852131676536942</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.08527973144699</liquidity>
		<leverage>1.45521235503414</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0845</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Guelph Hydro Electric Systems Inc.</dist>
		<connections>0.9226</connections>
		<appointments>0.9681</appointments>
		<tele>0.7171</tele>
		<billacc>100</billacc>
		<firstcont>100%</firstcont>
		<custsurvey>89%</custsurvey>
		<publicawareness>0.86</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.6788479146088</powerouttimes>
		<powerouthrs>0.264158815044078</powerouthrs>
		<distplan>98.78%</distplan>
		<efficiency>3</efficiency>
		<costpercust>669</costpercust>
		<costperkm>32312</costperkm>
		<cumenergy>1.2586830570382</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.33440149449534</liquidity>
		<leverage>1.55694698851745</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0818</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Halton Hills Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.9998</appointments>
		<tele>0.9663</tele>
		<billacc>100</billacc>
		<firstcont>99.98%</firstcont>
		<custsurvey>95%</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.6009323760028</powerouttimes>
		<powerouthrs>1.47539999202273</powerouthrs>
		<distplan>123.38%</distplan>
		<efficiency>1</efficiency>
		<costpercust>794</costpercust>
		<costperkm>10860</costperkm>
		<cumenergy>0.770109790344543</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.456087077473333</liquidity>
		<leverage>1.88012647787794</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0707</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hearst Power Distribution Company Limited</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.8808</tele>
		<billacc>100</billacc>
		<firstcont>99%</firstcont>
		<custsurvey>96% Good</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.09465317919075</powerouttimes>
		<powerouthrs>2.67449421965318</powerouthrs>
		<distplan>Established</distplan>
		<efficiency>2</efficiency>
		<costpercust>555</costpercust>
		<costperkm>15419</costperkm>
		<cumenergy>1.90376764640338</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>2.3788476985228</liquidity>
		<leverage>0.373339745458395</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0677</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro 2000 Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9995</tele>
		<billacc>100</billacc>
		<firstcont>95.82%</firstcont>
		<custsurvey>91.48%</custsurvey>
		<publicawareness>0.99</publicawareness>
		<ontreg>NC</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.809363221583019</powerouttimes>
		<powerouthrs>0.0372941876611783</powerouthrs>
		<distplan>25%</distplan>
		<efficiency>2</efficiency>
		<costpercust>544</costpercust>
		<costperkm>32704</costperkm>
		<cumenergy>0.632470671880939</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>2.00147779801511</liquidity>
		<leverage>0.0000152739835031454</leverage>
		<profitdeemed>0.0912</profitdeemed>
		<profitachieved>-0.0716</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro Hawkesbury Inc.</dist>
		<connections>0.9444</connections>
		<appointments>0.9661</appointments>
		<tele>0.9999</tele>
		<billacc>100</billacc>
		<firstcont>96.13%</firstcont>
		<custsurvey>87.20%</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.91924460431655</powerouttimes>
		<powerouthrs>2.92428057553957</powerouthrs>
		<distplan>Complete</distplan>
		<efficiency>1</efficiency>
		<costpercust>313</costpercust>
		<costperkm>24783</costperkm>
		<cumenergy>0.774692302827857</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>2.04462668525386</liquidity>
		<leverage>0.84884471034621</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>-0.041</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro One Networks Inc.</dist>
		<connections>0.9932</connections>
		<appointments>0.9995</appointments>
		<tele>0.7805</tele>
		<billacc>99</billacc>
		<firstcont>87%</firstcont>
		<custsurvey>86%</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>11</genincidents>
		<rateperkm>0.09</rateperkm>
		<powerouttimes>2.21005938095122</powerouttimes>
		<powerouthrs>6.81641977474583</powerouthrs>
		<distplan>97.93%</distplan>
		<efficiency>4</efficiency>
		<costpercust>1022</costpercust>
		<costperkm>11069</costperkm>
		<cumenergy>0.979659026847069</cumenergy>
		<genconn>1</genconn>
		<genfac>0.9945</genfac>
		<liquidity>0.495915862367428</liquidity>
		<leverage>1.44007820674459</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0807</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro One Remote Communities Inc.</dist>
		<connections>0.9533</connections>
		<appointments>N/A</appointments>
		<tele>1</tele>
		<billacc>98</billacc>
		<firstcont>100%</firstcont>
		<custsurvey>90%</custsurvey>
		<publicawareness>0.704</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.02379151481813</powerouttimes>
		<powerouthrs>4.93708313277866</powerouthrs>
		<distplan>100%</distplan>
		<efficiency>N/A</efficiency>
		<costpercust>N/A</costpercust>
		<costperkm>N/A</costperkm>
		<cumenergy>N/A</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.00233274158486</liquidity>
		<leverage>N/A</leverage>
		<profitdeemed>N/A</profitdeemed>
		<profitachieved>N/A</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Hydro Ottawa Limited</dist>
		<connections>1</connections>
		<appointments>0.9965</appointments>
		<tele>0.8874</tele>
		<billacc>100</billacc>
		<firstcont>85.52%</firstcont>
		<custsurvey>93.00%</custsurvey>
		<publicawareness>0.7</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.783458154980475</powerouttimes>
		<powerouthrs>0.850332514844324</powerouthrs>
		<distplan>113.00%</distplan>
		<efficiency>4</efficiency>
		<costpercust>701</costpercust>
		<costperkm>40766</costperkm>
		<cumenergy>0.854754205385345</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>0.801809119161332</liquidity>
		<leverage>1.86151696513041</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0914</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Innpower Corporation</dist>
		<connections>0.9184</connections>
		<appointments>0.8721</appointments>
		<tele>0.8385</tele>
		<billacc>100</billacc>
		<firstcont>99.79%</firstcont>
		<custsurvey>B</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.882494616581433</powerouttimes>
		<powerouthrs>2.65565198807452</powerouthrs>
		<distplan>98%</distplan>
		<efficiency>3</efficiency>
		<costpercust>834</costpercust>
		<costperkm>17231</costperkm>
		<cumenergy>0.839441257175824</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.939135175480979</liquidity>
		<leverage>1.61310487916591</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1147</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kenora Hydro Electric Corporation Ltd.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.97</tele>
		<billacc>100</billacc>
		<firstcont>99%</firstcont>
		<custsurvey>76%</custsurvey>
		<publicawareness>0.78</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.11623394853876</powerouttimes>
		<powerouthrs>0.213334000933448</powerouthrs>
		<distplan>In Progress</distplan>
		<efficiency>2</efficiency>
		<costpercust>633</costpercust>
		<costperkm>35943</costperkm>
		<cumenergy>0.787157681794343</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>3.97196325074865</liquidity>
		<leverage>0.607673085870171</leverage>
		<profitdeemed>0.0958</profitdeemed>
		<profitachieved>-0.013</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kingston Hydro Corporation</dist>
		<connections>1</connections>
		<appointments>0.9868</appointments>
		<tele>0.6078</tele>
		<billacc>100</billacc>
		<firstcont>98.96%</firstcont>
		<custsurvey>'A'</custsurvey>
		<publicawareness>0.8</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.00444185136888</powerouttimes>
		<powerouthrs>1.50112951178821</powerouthrs>
		<distplan>On Track</distplan>
		<efficiency>3</efficiency>
		<costpercust>583</costpercust>
		<costperkm>48238</costperkm>
		<cumenergy>0.838960347346118</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.57314560384274</liquidity>
		<leverage>1.09880219308609</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0748</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Kitchener-Wilmot Hydro Inc.</dist>
		<connections>0.9914</connections>
		<appointments>0.9918</appointments>
		<tele>0.919</tele>
		<billacc>97</billacc>
		<firstcont>99.03%</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>3</genincidents>
		<rateperkm>1.524</rateperkm>
		<powerouttimes>0.971853461475019</powerouttimes>
		<powerouthrs>0.695596088862823</powerouthrs>
		<distplan>In Progress</distplan>
		<efficiency>2</efficiency>
		<costpercust>519</costpercust>
		<costperkm>25447</costperkm>
		<cumenergy>0.996682283830681</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>2.01260335037769</liquidity>
		<leverage>0.514635722315403</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0906</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Lakefront Utilities Inc.</dist>
		<connections>0.9899</connections>
		<appointments>0.9909</appointments>
		<tele>0.9547</tele>
		<billacc>100</billacc>
		<firstcont>99.14%</firstcont>
		<custsurvey>80.70%</custsurvey>
		<publicawareness>0.833</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.123138411761907</powerouttimes>
		<powerouthrs>0.324308892801066</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>2</efficiency>
		<costpercust>497</costpercust>
		<costperkm>24064</costperkm>
		<cumenergy>0.887406820460404</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.61928224806726</liquidity>
		<leverage>1.07264518010229</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0776</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Lakeland Power Distribution Ltd.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.93</tele>
		<billacc>100</billacc>
		<firstcont>99.97</firstcont>
		<custsurvey>75.00%</custsurvey>
		<publicawareness>0.838</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.50117267663442</powerouttimes>
		<powerouthrs>2.82028730577543</powerouthrs>
		<distplan>Complete</distplan>
		<efficiency>2</efficiency>
		<costpercust>744</costpercust>
		<costperkm>28665</costperkm>
		<cumenergy>0.874253413793305</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.6481450727426</liquidity>
		<leverage>1.12401514714623</leverage>
		<profitdeemed>0.0908</profitdeemed>
		<profitachieved>0.1259</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>London Hydro Inc.</dist>
		<connections>0.9948</connections>
		<appointments>1</appointments>
		<tele>0.7033</tele>
		<billacc>100</billacc>
		<firstcont>99.7</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>3</genincidents>
		<rateperkm>1.04</rateperkm>
		<powerouttimes>1.39691213357471</powerouttimes>
		<powerouthrs>0.823906253617022</powerouthrs>
		<distplan>Above Budget</distplan>
		<efficiency>3</efficiency>
		<costpercust>552</costpercust>
		<costperkm>28955</costperkm>
		<cumenergy>0.871236213994513</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.26952308672611</liquidity>
		<leverage>0.840571791029816</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1008</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Milton Hydro Distribution Inc.</dist>
		<connections>0.9961</connections>
		<appointments>1</appointments>
		<tele>0.9387</tele>
		<billacc>100</billacc>
		<firstcont>99.2</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.831439670903299</powerouttimes>
		<powerouthrs>0.74270563775202</powerouthrs>
		<distplan>On Track</distplan>
		<efficiency>2</efficiency>
		<costpercust>683</costpercust>
		<costperkm>10195</costperkm>
		<cumenergy>0.973973015195921</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.64631339777897</liquidity>
		<leverage>1.23934621336925</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.1045</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Newmarket-Tay Power Distribution Ltd.</dist>
		<connections>1</connections>
		<appointments>0.9999</appointments>
		<tele>0.7086</tele>
		<billacc>100</billacc>
		<firstcont>93.7</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.783939344906498</powerouttimes>
		<powerouthrs>0.660872379279258</powerouthrs>
		<distplan>103</distplan>
		<efficiency>2</efficiency>
		<costpercust>657</costpercust>
		<costperkm>28067</costperkm>
		<cumenergy>0.86994159932125</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.40600586616539</liquidity>
		<leverage>1.22539055224143</leverage>
		<profitdeemed>0.0966</profitdeemed>
		<profitachieved>0.1119</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Niagara Peninsula Energy Inc.</dist>
		<connections>0.9333</connections>
		<appointments>0.9889</appointments>
		<tele>0.8587</tele>
		<billacc>99</billacc>
		<firstcont>91%</firstcont>
		<custsurvey>95%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.65177618752489</powerouttimes>
		<powerouthrs>1.98167631622751</powerouthrs>
		<distplan>99.27%</distplan>
		<efficiency>3</efficiency>
		<costpercust>755</costpercust>
		<costperkm>20745</costperkm>
		<cumenergy>0.719332385358837</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.44006505024627</liquidity>
		<leverage>0.921603810941177</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0503</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Niagara-on-the-Lake Hydro Inc.</dist>
		<connections>0.9942</connections>
		<appointments>1</appointments>
		<tele>0.8998</tele>
		<billacc>100</billacc>
		<firstcont>12</firstcont>
		<custsurvey>78.8%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.483115885194175</powerouttimes>
		<powerouthrs>0.762987719389483</powerouthrs>
		<distplan>101%</distplan>
		<efficiency>3</efficiency>
		<costpercust>761</costpercust>
		<costperkm>19565</costperkm>
		<cumenergy>1.03502255696365</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>0.606479719672674</liquidity>
		<leverage>0.547069852422423</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1012</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>North Bay Hydro Distribution Limited</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9113</tele>
		<billacc>100</billacc>
		<firstcont>4</firstcont>
		<custsurvey>89%</custsurvey>
		<publicawareness>0.81</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.40400626494106</powerouttimes>
		<powerouthrs>1.9532190256368</powerouthrs>
		<distplan>112%</distplan>
		<efficiency>3</efficiency>
		<costpercust>695</costpercust>
		<costperkm>29208</costperkm>
		<cumenergy>1.45830652467584</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.83606949478998</liquidity>
		<leverage>0.998215952030658</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.1017</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Northern Ontario Wires Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>1</tele>
		<billacc>100</billacc>
		<firstcont>100%</firstcont>
		<custsurvey>88%</custsurvey>
		<publicawareness>0.8082</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.47093852218401</powerouttimes>
		<powerouthrs>4.72649500964522</powerouthrs>
		<distplan>Excellent</distplan>
		<efficiency>1</efficiency>
		<costpercust>695</costpercust>
		<costperkm>11085</costperkm>
		<cumenergy>1.22037480139032</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.79779554529273</liquidity>
		<leverage>1.06034829110428</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0997</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Oakville Hydro Electricity Distribution Inc.</dist>
		<connections>0.9516</connections>
		<appointments>1</appointments>
		<tele>0.852</tele>
		<billacc>100</billacc>
		<firstcont>96.5</firstcont>
		<custsurvey>92</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.802744972869454</powerouttimes>
		<powerouthrs>0.624571531661555</powerouthrs>
		<distplan>On Track</distplan>
		<efficiency>3</efficiency>
		<costpercust>719</costpercust>
		<costperkm>27071</costperkm>
		<cumenergy>0.969792574948477</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.41897691518821</liquidity>
		<leverage>0.946876767943463</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1065</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Orangeville Hydro Limited</dist>
		<connections>1</connections>
		<appointments>0.9976</appointments>
		<tele>0.9994</tele>
		<billacc>100</billacc>
		<firstcont>99.9</firstcont>
		<custsurvey>78.2%</custsurvey>
		<publicawareness>0.862</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.16314443440221</powerouttimes>
		<powerouthrs>0.294310655251846</powerouthrs>
		<distplan>87%</distplan>
		<efficiency>2</efficiency>
		<costpercust>551</costpercust>
		<costperkm>31233</costperkm>
		<cumenergy>0.837165218027449</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.56080658047213</liquidity>
		<leverage>1.05092880955152</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.1192</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Orillia Power Distribution Corporation</dist>
		<connections>1</connections>
		<appointments>0.9978</appointments>
		<tele>0.9695</tele>
		<billacc>100</billacc>
		<firstcont>99.9</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.49999103605299</powerouttimes>
		<powerouthrs>1.42562613169831</powerouthrs>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>666</costpercust>
		<costperkm>38646</costperkm>
		<cumenergy>0.554992900049079</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.721528273713407</liquidity>
		<leverage>0.970109722212762</leverage>
		<profitdeemed>0.0985</profitdeemed>
		<profitachieved>0.0755</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Oshawa PUC Networks Inc.</dist>
		<connections>0.9978</connections>
		<appointments>1</appointments>
		<tele>0.901</tele>
		<billacc>100</billacc>
		<firstcont>103</firstcont>
		<custsurvey>95% Satisfied</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.28660154391499</powerouttimes>
		<powerouthrs>1.34002563190358</powerouthrs>
		<distplan>70.2%</distplan>
		<efficiency>2</efficiency>
		<costpercust>569</costpercust>
		<costperkm>33915</costperkm>
		<cumenergy>0.8282244096098</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.06613768499224</liquidity>
		<leverage>1.21210783198963</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0793</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Ottawa River Power Corporation</dist>
		<connections>1</connections>
		<appointments>0.9864</appointments>
		<tele>0.9992</tele>
		<billacc>100</billacc>
		<firstcont>98.5%</firstcont>
		<custsurvey>80.3%</custsurvey>
		<publicawareness>0.804</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.24276144481784</powerouttimes>
		<powerouthrs>0.529499476999088</powerouthrs>
		<distplan>Implemented</distplan>
		<efficiency>2</efficiency>
		<costpercust>484</costpercust>
		<costperkm>11104</costperkm>
		<cumenergy>0.967527302414709</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.4592788247615</liquidity>
		<leverage>0.638406511979163</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.1356</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Peterborough Distribution Incorporated</dist>
		<connections>0.9919</connections>
		<appointments>0.9991</appointments>
		<tele>0.8747</tele>
		<billacc>100</billacc>
		<firstcont>0</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>2</genincidents>
		<rateperkm>0.35</rateperkm>
		<powerouttimes>1.91926144875896</powerouttimes>
		<powerouthrs>2.17716051882145</powerouthrs>
		<distplan>87</distplan>
		<efficiency>3</efficiency>
		<costpercust>592</costpercust>
		<costperkm>38383</costperkm>
		<cumenergy>0.905364549830842</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.39343291821214</liquidity>
		<leverage>1.12031191482144</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0731</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>PUC Distribution Inc.</dist>
		<connections>0.9912</connections>
		<appointments>0.9848</appointments>
		<tele>0.777</tele>
		<billacc>100</billacc>
		<firstcont>99.80%</firstcont>
		<custsurvey>80%</custsurvey>
		<publicawareness>0.85</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.135</rateperkm>
		<powerouttimes>1.28427832478356</powerouttimes>
		<powerouthrs>1.27482920266049</powerouthrs>
		<distplan>100%</distplan>
		<efficiency>4</efficiency>
		<costpercust>690</costpercust>
		<costperkm>31338</costperkm>
		<cumenergy>1.04839362549442</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.32649207937982</liquidity>
		<leverage>2.02444949188798</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0425</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Renfrew Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.9563</appointments>
		<tele>0.9859</tele>
		<billacc>100</billacc>
		<firstcont>99.82%</firstcont>
		<custsurvey>86.2%</custsurvey>
		<publicawareness>0.854</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.816098145379236</powerouttimes>
		<powerouthrs>1.77428791663958</powerouthrs>
		<distplan>33%</distplan>
		<efficiency>3</efficiency>
		<costpercust>618</costpercust>
		<costperkm>32922</costperkm>
		<cumenergy>0.848903892804411</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.31891396215009</liquidity>
		<leverage>0.803057335865888</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1081</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Rideau St. Lawrence Distribution Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.7676</tele>
		<billacc>93</billacc>
		<firstcont>99.7%</firstcont>
		<custsurvey>B</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.261808479593113</powerouttimes>
		<powerouthrs>0.454079292950348</powerouthrs>
		<distplan>74%</distplan>
		<efficiency>3</efficiency>
		<costpercust>570</costpercust>
		<costperkm>31459</costperkm>
		<cumenergy>0.990610924622691</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>0.849741964107691</liquidity>
		<leverage>0.414724960311947</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0511</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Sioux Lookout Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9317</tele>
		<billacc>100</billacc>
		<firstcont>100%</firstcont>
		<custsurvey>72.07</custsurvey>
		<publicawareness>0.79</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.7753382654927</powerouttimes>
		<powerouthrs>1.40615769782554</powerouthrs>
		<distplan>108.4%</distplan>
		<efficiency>3</efficiency>
		<costpercust>836</costpercust>
		<costperkm>3338</costperkm>
		<cumenergy>0.539992473594079</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.05937317274962</liquidity>
		<leverage>0.461590736984139</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.0943</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Thunder Bay Hydro Electricity Distribution Inc.</dist>
		<connections>0.9914</connections>
		<appointments>1</appointments>
		<tele>0.9479</tele>
		<billacc>100</billacc>
		<firstcont>A+</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.88097759174071</powerouttimes>
		<powerouthrs>2.32992934290118</powerouthrs>
		<distplan>101.14</distplan>
		<efficiency>4</efficiency>
		<costpercust>682</costpercust>
		<costperkm>30130</costperkm>
		<cumenergy>1.26248319352242</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>1.56386459045906</liquidity>
		<leverage>0.798004445706559</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.0893</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Tillsonburg Hydro Inc.</dist>
		<connections>0.9796</connections>
		<appointments>1</appointments>
		<tele>0.8818</tele>
		<billacc>100</billacc>
		<firstcont>98.62</firstcont>
		<custsurvey>Satisifed</custsurvey>
		<publicawareness>0.816</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>2.28394290211418</powerouttimes>
		<powerouthrs>1.82520399459952</powerouthrs>
		<distplan>In Progress</distplan>
		<efficiency>3</efficiency>
		<costpercust>718</costpercust>
		<costperkm>37620</costperkm>
		<cumenergy>0.73447469139774</cumenergy>
		<genconn>1</genconn>
		<genfac>0</genfac>
		<liquidity>1.64346448850927</liquidity>
		<leverage>0.0689959665294322</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.051</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Toronto Hydro-Electric System Limited</dist>
		<connections>0.998</connections>
		<appointments>0.9966</appointments>
		<tele>0.8015</tele>
		<billacc>99</billacc>
		<firstcont>89%</firstcont>
		<custsurvey>92%</custsurvey>
		<publicawareness>0.69</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>6</genincidents>
		<rateperkm>0.209</rateperkm>
		<powerouttimes>1.13817946512044</powerouttimes>
		<powerouthrs>0.811058201599678</powerouthrs>
		<distplan>95%</distplan>
		<efficiency>5</efficiency>
		<costpercust>1123</costpercust>
		<costperkm>30210</costperkm>
		<cumenergy>0.77870230776646</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>0.531431608804578</liquidity>
		<leverage>1.19914338963472</leverage>
		<profitdeemed>0.093</profitdeemed>
		<profitachieved>0.0933</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Veridian Connections Inc.</dist>
		<connections>0.957</connections>
		<appointments>0.9905</appointments>
		<tele>0.8087</tele>
		<billacc>100</billacc>
		<firstcont>83.7%</firstcont>
		<custsurvey>95%</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.38</rateperkm>
		<powerouttimes>1.25766935142529</powerouttimes>
		<powerouthrs>1.55128747773777</powerouthrs>
		<distplan>99.19</distplan>
		<efficiency>3</efficiency>
		<costpercust>603</costpercust>
		<costperkm>27737</costperkm>
		<cumenergy>0.773028428074658</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.771588248505774</liquidity>
		<leverage>1.25832455199803</leverage>
		<profitdeemed>0.0936</profitdeemed>
		<profitachieved>0.0921</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Wasaga Distribution Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9999</tele>
		<billacc>100</billacc>
		<firstcont>0.128</firstcont>
		<custsurvey>81.6</custsurvey>
		<publicawareness>0.856</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.618318514520543</powerouttimes>
		<powerouthrs>0.78191179801838</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>1</efficiency>
		<costpercust>435</costpercust>
		<costperkm>21430</costperkm>
		<cumenergy>1.03255217427774</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>2.88965424345851</liquidity>
		<leverage>0.29709078896495</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0938</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Waterloo North Hydro Inc.</dist>
		<connections>1</connections>
		<appointments>0.9933</appointments>
		<tele>0.9272</tele>
		<billacc>100</billacc>
		<firstcont>99.87%</firstcont>
		<custsurvey>96%</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>6</genincidents>
		<rateperkm>3.645</rateperkm>
		<powerouttimes>1.31961651081911</powerouttimes>
		<powerouthrs>0.919664905033348</powerouthrs>
		<distplan>61.36%</distplan>
		<efficiency>3</efficiency>
		<costpercust>819</costpercust>
		<costperkm>28499</costperkm>
		<cumenergy>0.803681907132233</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.08163157889814</liquidity>
		<leverage>1.14059166172173</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.082</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Welland Hydro-Electric System Corp.</dist>
		<connections>1</connections>
		<appointments>0.949</appointments>
		<tele>0.9729</tele>
		<billacc>100</billacc>
		<firstcont>80</firstcont>
		<custsurvey>96</custsurvey>
		<publicawareness>0.83</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>1.7047931434002</powerouttimes>
		<powerouthrs>1.46375832357049</powerouthrs>
		<distplan>Competed</distplan>
		<efficiency>2</efficiency>
		<costpercust>501</costpercust>
		<costperkm>24354</costperkm>
		<cumenergy>0.544660677798199</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.53159850332352</liquidity>
		<leverage>0.774656770975093</leverage>
		<profitdeemed>0.0878</profitdeemed>
		<profitachieved>0.1141</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Wellington North Power Inc.</dist>
		<connections>1</connections>
		<appointments>0.9909</appointments>
		<tele>0.99</tele>
		<billacc>100</billacc>
		<firstcont>99.87%</firstcont>
		<custsurvey>81.1%</custsurvey>
		<publicawareness>0.833</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.33187430587313</powerouttimes>
		<powerouthrs>0.156529692297642</powerouthrs>
		<distplan>69%</distplan>
		<efficiency>4</efficiency>
		<costpercust>818</costpercust>
		<costperkm>39383</costperkm>
		<cumenergy>0.495121422112909</cumenergy>
		<genconn>1</genconn>
		<genfac>1</genfac>
		<liquidity>1.0263331364982</liquidity>
		<leverage>1.47961127801881</leverage>
		<profitdeemed>0.0919</profitdeemed>
		<profitachieved>0.0777</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>West Coast Huron Energy Inc.</dist>
		<connections>1</connections>
		<appointments>1</appointments>
		<tele>0.9884</tele>
		<billacc>100</billacc>
		<firstcont>99</firstcont>
		<custsurvey>77</custsurvey>
		<publicawareness>0.84</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.182082190517897</powerouttimes>
		<powerouthrs>0.130863571525521</powerouthrs>
		<distplan>87</distplan>
		<efficiency>5</efficiency>
		<costpercust>825</costpercust>
		<costperkm>52357</costperkm>
		<cumenergy>0.585756783961167</cumenergy>
		<genconn>0</genconn>
		<genfac>0</genfac>
		<liquidity>0.839797768581748</liquidity>
		<leverage>0.878977830764572</leverage>
		<profitdeemed>0.0898</profitdeemed>
		<profitachieved>0.0646</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Westario Power Inc.</dist>
		<connections>0.9061</connections>
		<appointments>0.964</appointments>
		<tele>0.8692</tele>
		<billacc>100</billacc>
		<firstcont>98.95</firstcont>
		<custsurvey>92.00</custsurvey>
		<publicawareness>0.82</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>0</genincidents>
		<rateperkm>0</rateperkm>
		<powerouttimes>0.210352611478174</powerouttimes>
		<powerouthrs>0.579181337037058</powerouthrs>
		<distplan>Completed</distplan>
		<efficiency>3</efficiency>
		<costpercust>575</costpercust>
		<costperkm>24850</costperkm>
		<cumenergy>0.78032898528575</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>1.40222370603147</liquidity>
		<leverage>0.733254985712125</leverage>
		<profitdeemed>0.09</profitdeemed>
		<profitachieved>0.101</profitachieved>
	</PerformanceItemRow>
	<PerformanceItemRow>
		<dist>Whitby Hydro Electric Corporation</dist>
		<connections>0.9881</connections>
		<appointments>0.9973</appointments>
		<tele>0.8736</tele>
		<billacc>100</billacc>
		<firstcont>99.82</firstcont>
		<custsurvey>A</custsurvey>
		<publicawareness>0.836</publicawareness>
		<ontreg>C</ontreg>
		<genincidents>1</genincidents>
		<rateperkm>0.906</rateperkm>
		<powerouttimes>0.861498829039813</powerouttimes>
		<powerouthrs>0.676393442622951</powerouthrs>
		<distplan>98.76</distplan>
		<efficiency>3</efficiency>
		<costpercust>681</costpercust>
		<costperkm>25745</costperkm>
		<cumenergy>0.716831451801932</cumenergy>
		<genconn>0</genconn>
		<genfac>1</genfac>
		<liquidity>0.921516891400477</liquidity>
		<leverage>0.594959370792095</leverage>
		<profitdeemed>0.0966</profitdeemed>
		<profitachieved>0.1184</profitachieved>
	</PerformanceItemRow>
</PerformanceItemsTable>