<?xml version="1.0" encoding="UTF-8"?><ALL_OPEN_APPLICATIONS><LIST_G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2024-0115</APPLICATION1><DATE_FILED1>15-Apr-2025</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro Ottawa Limited</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2026 electricity distribution rates, custom IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Cost Awards</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2024-0142</APPLICATION1><DATE_FILED1>16-Dec-2024</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Continued operation of existing transmission facilities in Port Colborne </APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Submissions</CASE_STATUS><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2024-0342</APPLICATION1><DATE_FILED1>21-Nov-2024</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Certificate of Public Convenience and Necessity, Tay Valley Township</APPLICATION_NAME><PROCESS_TYPE>Facilities: F&amp;C – Complex</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0024</APPLICATION1><DATE_FILED1>09-Oct-2025</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Lakeland Power Distribution Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2026 electricity distribution rates, IRM</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Decision Writing</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0024</APPLICATION1><DATE_FILED1>01-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Lakeland Power Distribution Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2026 electricity distribution rates, IRM</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Cost Awards</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0058</APPLICATION1><DATE_FILED1>06-Jan-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Franchise + new Certificate, City of Guelph</APPLICATION_NAME><PROCESS_TYPE>Facilities: F&amp;C – Complex</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0064</APPLICATION1><DATE_FILED1>28-Feb-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2024-2028 natural gas distribution rates, Phase 3</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Cost Awards</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0064</APPLICATION1><DATE_FILED1>27-Mar-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2024-2028 natural gas distribution rates, Phase 3</APPLICATION_NAME><PROCESS_TYPE>Rates: Policy-Related</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Submissions</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0065</APPLICATION1><DATE_FILED1>01-May-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2025 Annual Update to Five-Year Natural Gas Supply Plan of Enbridge Gas Inc.</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Cost Awards</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0252</APPLICATION1><DATE_FILED1>14-Oct-2025</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Alectra Utilities Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027-2031 electricity distribution rates, custom IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>ADR</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0295</APPLICATION1><DATE_FILED1>18-Dec-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Demand Side Management (DSM) Plan - 2027 +</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Oral Hearing</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0297</APPLICATION1><DATE_FILED1>19-Dec-2025</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Ontario Power Generation Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>OPG payment amounts for 2027-2031 </APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>ADR</CASE_STATUS><LICENCE_TYPE>Electricity Generator</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0312</APPLICATION1><DATE_FILED1>19-Dec-2025</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Elexicon Energy Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Early Rebasing Application - 2027</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &gt;$500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0313</APPLICATION1><DATE_FILED1>19-Nov-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Cedar Springs Community Expansion Project</APPLICATION_NAME><PROCESS_TYPE>Facilities: Policy-Related</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2025-0323</APPLICATION1><DATE_FILED1>12-Dec-2025</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Merrickville Community Expansion Project - leave to construct exemption</APPLICATION_NAME><PROCESS_TYPE>Facilities: Policy-Related</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0018</APPLICATION1><DATE_FILED1>29-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Leave to Construct - Orléans Area Reinforcement</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0025</APPLICATION1><DATE_FILED1>12-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Algoma Power Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM - Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0028</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Burlington Hydro Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0029</APPLICATION1><DATE_FILED1>20-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Canadian Niagara Power Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distribution rates, cost of service (CoS)</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0030</APPLICATION1><DATE_FILED1>12-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Centre Wellington Hydro Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM - Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0031</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Cooperative Hydro Embrun Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0032</APPLICATION1><DATE_FILED1>28-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>E.L.K. Energy Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 Cost of Service, EDR</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>P.O. #1</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0033</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enova Power Corp.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0035</APPLICATION1><DATE_FILED1>12-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>ENWIN Utilities Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0036</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>EPCOR Electricity Distribution Ontario Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0038</APPLICATION1><DATE_FILED1>18-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Essex Powerlines Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0040</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Festival Hydro Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0042</APPLICATION1><DATE_FILED1>12-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>GrandBridge Energy Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distribution rates</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0044</APPLICATION1><DATE_FILED1>13-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Grimsby Power Incorporated</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0048</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro Hawkesbury Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0049</APPLICATION1><DATE_FILED1>25-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distributionr rates, Custom IR update</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0051</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro Ottawa Limited</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Custom IR Update, EDR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0052</APPLICATION1><DATE_FILED1>28-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>InnPower Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distibution rates, cost of service (CoS)</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0053</APPLICATION1><DATE_FILED1>07-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Kingston Hydro Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0054</APPLICATION1><DATE_FILED1>26-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Lakefront Utilities Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distribution rates, Cost of Service</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Completeness</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0056</APPLICATION1><DATE_FILED1>28-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>London Hydro Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 Cost of Service Application, EDR</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Completeness</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0057</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Milton Hydro Distribution Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0058</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Newmarket-Tay Power Distribution Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0059</APPLICATION1><DATE_FILED1>11-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Niagara Peninsula Energy Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0060</APPLICATION1><DATE_FILED1>07-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Niagara-on-the-Lake Hydro Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0063</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Oakville Hydro Electricity Distribution Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0065</APPLICATION1><DATE_FILED1>10-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Oshawa PUC Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0066</APPLICATION1><DATE_FILED1>28-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Ottawa River Power Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 Cost of Service, EDR</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0068</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Renfrew Hydro Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0069</APPLICATION1><DATE_FILED1>30-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Rideau St. Lawrence Distribution Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity distribution rates, cost of service (CoS)</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0073</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Toronto Hydro-Electric System Limited</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 Custom IR Update, EDR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0077</APPLICATION1><DATE_FILED1>12-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Westario Power Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 IRM, Price Cap IR</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0078</APPLICATION1><DATE_FILED1>03-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Application for Transmission Rates under S78 of OEB Act</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0083</APPLICATION1><DATE_FILED1>04-Mar-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>St Thomas Transmission Line Project</APPLICATION_NAME><PROCESS_TYPE>Facilities: Expropriation</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0095</APPLICATION1><DATE_FILED1>13-Feb-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Essex Transmission GP Inc. on behalf of Essex Transmission LP</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Application for a Electricity Transmitter Licence</APPLICATION_NAME><PROCESS_TYPE>Licences: Admin-No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0108</APPLICATION1><DATE_FILED1>30-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2025 Utility Earnings, Deferral and Variance Disposition</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0112</APPLICATION1><DATE_FILED1>13-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>LTC Transmission Line between Chalk River and Petawawa Junction</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Submissions</CASE_STATUS><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0128</APPLICATION1><DATE_FILED1>19-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Longwood to Lakeshore Transmission Line Project - leave to construct</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0129</APPLICATION1><DATE_FILED1>10-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Toronto Hydro-Electric System Limited</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Non-Wires Solutions (NWS) Incentive</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0131</APPLICATION1><DATE_FILED1>16-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Independent Electricity System Operator</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Renewal of Smart Metering Entity Licence</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Smart Metering Entity</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0133</APPLICATION1><DATE_FILED1>08-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Motion to review the OEB decision in EB-2025-0254 (Wasaga Distrib. SAA)</APPLICATION_NAME><PROCESS_TYPE>Licences: New Evidence / Facts or Change in Circumstance</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0137</APPLICATION1><DATE_FILED1>14-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>MAADs</CATEGORY1><APPLICANT1>ERTH (Westario) Acquisition Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>MAADs - Purchase of 100% shares of, and amalgamation with, Westario Power</APPLICATION_NAME><PROCESS_TYPE>MAADs: Section 86:  Short-form (New)</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Notice</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0142</APPLICATION1><DATE_FILED1>23-Apr-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Independent Electricity System Operator</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2026-28 Expenditures, Revenue Requirement and Fees</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>IESO</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0145</APPLICATION1><DATE_FILED1>04-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>MAADs</CATEGORY1><APPLICANT1>ERTH Corporation</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>MAADs - Purchase of 100% shares of Tillsonburg Hydro Inc.</APPLICATION_NAME><PROCESS_TYPE>MAADs: Section 86:  Short-form (New)</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0147</APPLICATION1><DATE_FILED1>05-May-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>EPCOR Natural Gas Limited Partnership</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Norfolk County Certificate transfer</APPLICATION_NAME><PROCESS_TYPE>Facilities: F&amp;C – Complex</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0148</APPLICATION1><DATE_FILED1>10-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>EPCOR Natural Gas Limited Partnership</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 distribution rates, IRM, Aylmer service area</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0149</APPLICATION1><DATE_FILED1>31-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>EPCOR Natural Gas Limited Partnership</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 gas distribution rates, custom IR annual update, South Bruce service area</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0152</APPLICATION1><DATE_FILED1>01-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Wataynikaneyap Power GP Inc. </APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027-2031 transmission revenue requirement</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0154</APPLICATION1><DATE_FILED1>19-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Northeast Power Line Tx Project (Mississagi x Hanmer)</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Submissions</CASE_STATUS><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0155</APPLICATION1><DATE_FILED1>12-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Durham Kawartha Power Line Project</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0157</APPLICATION1><DATE_FILED1>30-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 natural gas distribution rates, Phase 1</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Interrogatories</CASE_STATUS></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0165</APPLICATION1><DATE_FILED1>13-May-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Workbench Energy</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>NEW - Electricity Storage Licence Application</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0169</APPLICATION1><DATE_FILED1>23-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>2027 electricity transmission revenue requirement</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0177</APPLICATION1><DATE_FILED1>07-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Hydro One Remote Communities Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>ED licence amendment, exemptions from the Distribution System Code</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0178</APPLICATION1><DATE_FILED1>10-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Impala Canada Ltd.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Motion to Review and Vary, EB-2025-0286, expropriation proceeding</APPLICATION_NAME><PROCESS_TYPE>Facilities: Error (no discovery)</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Wholesaler</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0180</APPLICATION1><DATE_FILED1>03-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Wataynikaneyap Power GP Inc. </APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Deferral Account disposition</APPLICATION_NAME><PROCESS_TYPE>Rates: Cost Based: &lt; $500 Million</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0181</APPLICATION1><DATE_FILED1>11-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Walker BESS 4 Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Schedule 1 amendment to add an operator for the listed facilities</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Storage</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0190</APPLICATION1><DATE_FILED1>15-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Arlen Energy Storage 1 LP</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Licence Amendment - Electricity Storage Licence</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Storage</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0193</APPLICATION1><DATE_FILED1>23-Jun-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Electricity Distribution rate order exemption related to Gross Load Billing</APPLICATION_NAME><PROCESS_TYPE>Rates: Complex Incentive</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><CASE_STATUS>Notice</CASE_STATUS><LICENCE_TYPE>Electricity Distributor</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0201</APPLICATION1><DATE_FILED1>03-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Jotson Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>NEW - Electricity Retailer Application</APPLICATION_NAME><PROCESS_TYPE>Licences: Admin-No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Retailer</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0202</APPLICATION1><DATE_FILED1>03-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Enerva Energy Solutions Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>NEW - Electricity Retailer Licence Application</APPLICATION_NAME><PROCESS_TYPE>Licences: Admin-No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0205</APPLICATION1><DATE_FILED1>17-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>Vaughan 3 Energy Storage 1 LP</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Electricity Storage amendment to change the operator name</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Storage</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0207</APPLICATION1><DATE_FILED1>11-Sep-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Hydro One Networks Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>K1 K2 Refurbishment Project in Kirkland Lake</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY><LICENCE_TYPE>Electricity Transmitter</LICENCE_TYPE></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0214</APPLICATION1><DATE_FILED1>22-Jul-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>ENVS Greener Solutions Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>NEW - Electricity Retailer Licence Application</APPLICATION_NAME><PROCESS_TYPE>Licences: Admin-No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0221</APPLICATION1><DATE_FILED1>09-Sep-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Q4 2026 QRAM </APPLICATION_NAME><PROCESS_TYPE>Rates: Schedule A QRAM Short-form</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0223</APPLICATION1><DATE_FILED1>18-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Casselman Pipeline Project</APPLICATION_NAME><PROCESS_TYPE>Facilities: LTC Complex Electricity &amp; Natural Gas</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Board Member Panel</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0225</APPLICATION1><DATE_FILED1>10-Sep-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Rates</CATEGORY1><APPLICANT1>EPCOR Natural Gas Limited Partnership</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Q4 2026 QRAM - Aylmer Service Area</APPLICATION_NAME><PROCESS_TYPE>Rates: Schedule A QRAM Short-form</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0231</APPLICATION1><DATE_FILED1>14-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Franchise agreement, Haldimand County</APPLICATION_NAME><PROCESS_TYPE>Facilities: F&amp;C – Short-form</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0239</APPLICATION1><DATE_FILED1>25-Aug-2026</DATE_FILED1><ENERGY_TYPE1>Gas</ENERGY_TYPE1><CATEGORY1>Facilities</CATEGORY1><APPLICANT1>Enbridge Gas Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Franchise agreement, Municipality of Markstay-Warren</APPLICATION_NAME><PROCESS_TYPE>Facilities: F&amp;C – Short-form</PROCESS_TYPE><APPLICATION_STATUS>Proceed</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY></G_APPLICATION1><G_APPLICATION1><APPLICATION1>EB-2026-0247</APPLICATION1><DATE_FILED1>03-Sep-2026</DATE_FILED1><ENERGY_TYPE1>Electricity</ENERGY_TYPE1><CATEGORY1>Licences</CATEGORY1><APPLICANT1>HCE Energy Inc.</APPLICANT1><REG_CASE_STATUS>Open</REG_CASE_STATUS><APPLICATION_NAME>Amendment to Schedule 1</APPLICATION_NAME><PROCESS_TYPE>Licences: No Hearing</PROCESS_TYPE><APPLICATION_STATUS>Complete</APPLICATION_STATUS><CASE_AUTHORITY>Delegated Authority</CASE_AUTHORITY><LICENCE_TYPE>Electricity Generator</LICENCE_TYPE></G_APPLICATION1></LIST_G_APPLICATION1></ALL_OPEN_APPLICATIONS>