<?xml version="1.0" encoding="UTF-8" standalone="yes"?>
<supply-delivery-data xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27326399218.93</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>263670559.9</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>43888486.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27605573320.32</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>269930339.97</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>46179945</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26646167042.3</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>259979852.73</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>43730992</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27698992767.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>289529261.89</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>44439814</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27075873795</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>294452029</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>46155408</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26784827648</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>303289819</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>51771592</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26976697476</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>297529210</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>52782383</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27549269645</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>293753454</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>53517247</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Alectra Utilities Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27301798153</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>268023392</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>57020757</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>216436883.92</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1922700</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>211094731.26</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2020113.3</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>219747433.34</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1866656.5</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>242046059.63</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2047599.63</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>255886922</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>383499</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>250690738.13</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1839873.4</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>263323474</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1933212.22</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>279789323.4</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1788164.33</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Algoma Power Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>278749182.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1837876.43</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>34806669.2</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>37949176.94</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31920519</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>32504833.3</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>110358</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31870380</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>95274</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>32677380</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>102842</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>33641480</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>100279</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31966340</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>112863.23</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Atikokan Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31859037.92</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>91919</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>865093093</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>152437072</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>895814684</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>149315437</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>861114855</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>139729780</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>884577795</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>135157736</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>866599110</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>135981048</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>838621439</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>146278687</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>837515774</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>148292847</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>848613603</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>146587508</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Bluewater Power Distribution Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>836373201</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>138967557</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1667272263</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6411564</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1691639324</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8224509</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1608319046</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>7566040</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1651250200</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8864623</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1586678040</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9288564</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1560832200</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9882707</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1570411100</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9718702</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1582272268</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9647170</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Burlington Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1538474828</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8663953</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>483968415.91</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15754163.66</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>881239.7</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>477023403.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15712312.8</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>891752.14</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>454247234.21</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>25445836.94</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>938835.96</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>485535767.83</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>17581465.6</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1522093.29</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>469787042</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>23684407</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>764498</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>467807428.91</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>18760679.3</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>849168.74</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>478421472.88</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13605663.55</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>856484.56</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>488753838.69</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>19657531.22</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>990743.64</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Canadian Niagara Power Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>484425683.84</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15795006.01</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1097522.02</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>145693145.96</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1603049.54</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2001733.71</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>146659706.84</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1576838.92</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2112865.73</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>140007741.98</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4442688.82</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1973822.41</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>145235416.29</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4945565.32</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2044487.21</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>141602686.17</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5676535.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2010107.93</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>143359479.67</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5097778.98</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2268465.52</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>147472361.92</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5776070.06</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2443720.44</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>149784235.08</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4269077.35</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2776357.75</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Centre Wellington Hydro Ltd.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>146471934.35</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5079471.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2840095.79</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>27625506</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>141250.17</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26137724</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>141776.16</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26216509</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>133963.94</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>25652508.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>111387.81</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>26466526.3</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>124995.77</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>24601581.9</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>123190.63</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23759233.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>112968.32</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>24506399</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>48758</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Chapleau Public Utilities Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23439380.4</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>29896472</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>96561</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>49439.89</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>29675839</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>97633</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>49679</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>29169181</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>90550</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>48530.76</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>30569635</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>173865</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>90878.34</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>30054520.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>92377</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>89800.45</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>30411238</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>101329</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>113392.64</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>30838620</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>99458</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>115415.75</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31908819</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>96688</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>127130</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Cooperative Hydro Embrun Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>31423663.2</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>94236.57</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>117854.71</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>247718854</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>244970130</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>236059300</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>252552933</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>248931820</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>245634676</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>250301277.84</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>245446263</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>E.L.K. Energy Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>292094713</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2444586494</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>16041329</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2510802561</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>19893901</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2399714017</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>23681041</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2473628404.16</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24825213.3</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2359662672.36</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>25870744.74</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2182351916.37</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>27654136.89</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2111391011</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>26751441</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2155064517.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>25768970.41</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ENWIN Utilities Ltd.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2116102798.24</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>25403494.97</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>312852946.15</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1592155</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>33644022.75</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>317072230.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1760138</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>39894074.49</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>307339771.43</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2016228.95</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>35499898.03</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>315450702.48</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1954753.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3955769.65</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>309631323.67</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1866884.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4163218.62</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>306437609.15</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1891299.63</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4837915.99</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>314108955.87</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1891037.15</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5024828.13</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>323883548.68</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1587037.81</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5321743.6</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>EPCOR Electricity Distribution Ontario Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>318303567.06</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1777516.06</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5883442.87</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>624782344.65</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>34947919.7</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1708347.57</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>600674660.53</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>36088519.3</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1346383.25</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>600349164.5</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>34240872.29</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1340430.07</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>626885976.5</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>33836263.41</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1093883.99</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>659447102</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>34783607</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>603035.58</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>641834380</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>37547985</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>29432808</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>654107117</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>10395532</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>288852.06</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>658148822</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>10026071</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>321661.42</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>ERTH Power Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>642691741</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>10046952</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>403796.84</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3534999823</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>28245787</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>16833500.71</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3523152911</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>70506408</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>17295510</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3378518744</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>90941928</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>16238394</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3578530017</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>72451827</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>17384995</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3563357008</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>30542678</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>16852989</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3601690266</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>20550686</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>22766685</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3640401028</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>20687167</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>22479266</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3691207866</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>19961449</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>26665697</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Elexicon Energy Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3674150076</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>20221066</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>28313559</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3296753229</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>68973048</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>190468.7</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3257097763.33</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>81040565.67</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>190369.16</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3162785130</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>80336296</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>158572.32</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3310243288.59</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>77256783.62</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1749</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3246666991.84</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>76437073.066</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1829</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3194055843.68</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>81500952.96</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1859</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3236830673.06</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>77493755.278</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1990</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3310524702.782</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>72482216.78</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1636438.47</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Enova Power Corp.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3231621897.29</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>73195311.71</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2046652.11</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1233869528.02</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>18475796.75</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>11656038</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1213933802.69</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>21045053.33</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>13420769.2</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1179627236.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24928225.57</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>13128084</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1232059401</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24932594</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>14381147</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1204787829</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>26168891</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>13493554</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1185560875</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>27332138</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>6606325</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1233076973</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>28017845</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7259973</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1269413782</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>27321016</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7530824</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Entegrus Powerlines Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1247779602</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24863891</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7995591</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>514093429</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>28353597</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7189127</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>452300010.38</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>110738005.53</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8197205.01</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>425165286.66</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>114569511.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7419211.49</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>486427581.87</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>71848436.95</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7718848.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>481037461.11</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>73312479.54</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8104771.75</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>478627874.86</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>67981210.51</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8927484.26</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>506350503.57</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>54792887.78</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>9471686.78</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>497224802.02</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64457675.7537718</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>10116429.02567</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Essex Powerlines Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>491124421.4</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>55831231.76</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>10622294.26</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>617941268.55</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2305457.57</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>260331.05</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>621878133</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2490290</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>898995.88</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>604658972</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2471290</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>838357</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>629588847</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3515847</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>846638</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>622901918</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3546580</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>892182</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>600842804</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3485920</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1005339.61</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>607272614</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3288942</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1027730.86</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>621162932</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3385153</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1052178.88</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Festival Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>619155747</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3147915</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1150287.12</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>76840844</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>250584</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>75610446</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>266978</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>75025461</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>137550</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>77158659</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>221116</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>76913512</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>229549.9</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>74093857</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>210501.6</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>73554983</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>233037</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>77029380</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Fort Frances Power Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>73075268</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>0</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2754107482</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>32423974</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1678779.65</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2729542195</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>35538047</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>618639.75</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2614185086</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>35325468</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1799892.01</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2725003012</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>39651769</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2102786.49</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2739025441</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>45878968</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1558148.96</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2717495301.74464</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>46094321.94</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1475649.1</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2778809389.85</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>44233649.31</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>20363955.13</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2832561048.86</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>45472999.81</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1731912.12</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>GrandBridge Energy Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>2849664116.64</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>41501505.95</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1751959.13</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>916818277</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>11126793</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1102589.35</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>888589557.6</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>16063941.36</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1472017.58</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>869204186.72</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>18538147.83</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1394912.11</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>895135426.73</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>18929684.88</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1419693.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>896137047.94</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>11578530.77</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1384163.89</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>866105758.2</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>12241113.25</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1328398.32</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>849458061.93</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13165824.84</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1351914.56</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>880211360.16</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9411737.69</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1761239.28</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Greater Sudbury Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>865797923.38</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9654691.84</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1906789.78</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>187986292</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>808355</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1380415.6</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>188985507.48</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>910246.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1398866.43</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>209659166.19</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1894524.91</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1229192.02</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>231532916.73</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6123474.8</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1346375.12</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>236747170.86</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3236603.31</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1415675.44</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>252928250</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1254630</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1683785.45</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>268243464</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8195745</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1941945.8</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>260709845.62</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9049332</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1766220.43</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grimsby Power Incorporated</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>254037311.98</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8425725</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1691630.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>526428961</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3949247</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7303034</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>522567049</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4982643</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7783938</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>496423841</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5961652</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>701193.06</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>516310452</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6956483.64</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7301922</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>509937057</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6683504</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>6462977</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>518336009</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>7232925</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7722945</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>514009437</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6916314</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7399965</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>516582344</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6883098</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>7821117</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Halton Hills Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>506319710</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6430683</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8333393</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>73794338</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>10193818</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>727910.28</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>70693965</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>11605918</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>751276.34</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>70309557.89</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9841803.17</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>943838.36</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>70291493.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>10217871.87</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1083731.37</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>70741409.42</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9973273.94</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1091914.07</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>64090635.64</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>12514649.96</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1101928.6</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>63809600.15</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13078213.83</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1205662.29</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>65682006.77</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13108181.64</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1328217.71</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hearst Power Distribution Company Limited</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>62685335.62</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>14544895.74</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1401604.63</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23588080.46</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>57487</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>181133.53</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>21329782.36</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>55758</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>183136.63</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>21411671.21</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>82377.04</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>107066.86</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>22313915.39</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>71199</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>22413232</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>65578</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>21255087</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64514</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>20820861.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64558.75</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>21026903</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>58788.97</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro 2000 Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>20174025</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>58363</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>80716332</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64612288</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>89485</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>73178347</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>70589891</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>211136</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>66346413</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>77587461</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>152671</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>75681173</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>73695875</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>187351</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>77380241</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>68866755</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>185199.64</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>72146996.09</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>69675119.61</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>174809.63</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>74116675</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>69019018</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>183050.69</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>147353082</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>125243</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>190842.46</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Hawkesbury Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>142302266</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>121797.73</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>222768.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>33647043460.79</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4747761328</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>15214546.24</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>32961832490.12</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4999365690.33</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>10315323.26</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>30203275104.39</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6756214842.33</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>10407116.55</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>34384640305.6</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5312560851.89</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8400844</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>33608986067.97</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5363659959.37</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>14635722.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>33475827937</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5767297286</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>14265413.72</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>34379188690</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5438445328</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>8827310.84</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>34650238328.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5613521325.83</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>12390721.28</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro One Networks Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>34790621383.11</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5055699809</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2359841.27</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>7494280103.74</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>167616984.31</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5140703.81</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>7466542829.95</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>172567673.93</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3348472.99</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>7262373609.38</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>183521414.75</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2773180.5</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>7314894166.44</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>330368674.35</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2892826.98</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>7168333132.35</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>330902155.27</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3133437.46</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>6816670454</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>484110584</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3169468</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>6828058736</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>524955229</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3163344</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>6881184147</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>581963966</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3565651.95</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Hydro Ottawa Limited</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>6985832024</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>515665164</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4505641.08</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>248977601.44</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2303572.8</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>253103100.82</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2903539.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>253997765.9</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2771668.66</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>275686299.05</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3126936.69</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>277447166.64</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3134370.26</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>288318809.13</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3085442.53598996</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>292108944.57</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3131309.56</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>296925015.79</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3009488.47</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>InnPower Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>300063007.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3040167.26</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>721756209.38</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4139476</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>722325191</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6674750</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>707465900</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2019559</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>723906041</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9676730</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>713208527</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4122744.21</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>676723508</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4426057</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>677509380</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6343704.45</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>702080499</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4313648.84</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Kingston Hydro Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>690802258</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4868372.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>244105613.37</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3117553.15</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2685339.15</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>240875049.23</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4261645.83</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3292141.81</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>237949815.52</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5710031.95</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3082780.78</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>251591722.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6072096.75</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3313383.37</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>248759588.59</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5938356.3</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3301766.59</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>242979888</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6642243.38</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3579169.18</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>243477974.1</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6759401.24</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3558710.61</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>249836664.87</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6218765.96</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4232651.94</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakefront Utilities Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>237484003.24</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6613671.55</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4200030.09</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>254023631</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>48468968</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>247355263</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>47572798</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>224065223.4</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>67227598</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>235490200</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>67038749</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4075122.02</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>242711467</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>60284073</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4010539.88</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>229410140</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>68982565</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4179292.45</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>237951404.14</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>65336458</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4472103.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>264982145.83</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>50259126</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5330530.81</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Lakeland Power Distribution Ltd.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>244324208</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64106669</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5435079.07</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3213257132</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>59773261</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>157531.97</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3251041122</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>47845802</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>158118.48</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3145326878</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>50164984</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>145061.11</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3253654556</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>72605576</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>139907.64</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3175996023</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>50181642</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>146803.12</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3134693559.46</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>43088464.99</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>144800.16</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3172865038.6</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>34980020.96</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>136385.91</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3245657121.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>39696717.94</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>164576.66</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>London Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>3218427081.55</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>38796939.73</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>157853.3</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>867379940</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>11696013</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1868824</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>891887438</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13860162</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2859469</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>877534937</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13275997</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2392776</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>930046732</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13397225</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2365267</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>931886733</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>12666355</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3064144</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>933163789</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>11875521</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3203262</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>959515191</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9956084</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2929089</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>982472010</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>9126474</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3168707</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Milton Hydro Distribution Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>971133865</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8518194</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>5457236</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>868307085.75</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2911171</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2775332.99</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>856849256.4</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3762123</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3026671.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>829986149</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3116331</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2843339.98</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>880423953</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4140499</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2895996</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>846593012</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3687148</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>870514</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>842882767.72</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4070835.92</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3906975</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>845225308</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3819013</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4034825</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>870203144</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4635294</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4079160.24</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Newmarket-Tay Power Distribution Ltd.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>846394308</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4566776</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4642214.12</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1195917515</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>47581815</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1208871237</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>48960077</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1162680417</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>49520799</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1216044534</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>54538079</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1201235052</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>51131686</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1141219695</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>51872030</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1172915396</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>46125928</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1237774552</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>49274415</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara Peninsula Energy Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1247276985.05</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>45366347.29</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>186601102.17</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15161220.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>194519543.07</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>14687576.43</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>190337392</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>13398228.12</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>210609486</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>14674855.08</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>221621630</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15369636</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>214213664</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15561750.71</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>208717294</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>16389832.59</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>202763927</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15889122</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Niagara-on-the-Lake Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>256245069</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>14849293</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>589953362</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8562602.29</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>928351.29</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>560120655</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>7922482.75</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>957139.52</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>550548765</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>8436489.54</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>808647.41</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>568272738</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>6428142.69</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>909623.08</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>568883257</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5323445</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1025648.79</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>548112546</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4999956</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>315860.5</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>547137844</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4431009</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>298879.1</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>569318976.33</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>3982222.66</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1490526.35</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>North Bay Hydro Distribution Limited</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>553480874</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4031184</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1573480.62</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>128151805</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>156524</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>374351</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>125962160</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>150316</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>350675</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>120700322</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>143925</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>326784</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>121721441</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>164317</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>319531</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>121696803</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>156377</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>347787</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>119479247</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>148658</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>391471</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>119238754</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>148276</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>396331</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>120295289</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>141163</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>399545</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Northern Ontario Wires Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>118398034</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>139928</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>467169.92</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1631010535.48</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1818752</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>990738.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1670588304.68</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4846867</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1059571.61</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1596019494</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4604887</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1047133.58</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1668726717.71</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5129765</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>851836.54</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1608610317.56</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4855713</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1115287.52</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1612434679.04</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5214772</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1507228.3</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1601164011.86</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5055658.38</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1919384.91</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1660938334.78</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4434047.77</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1186096.94</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oakville Hydro Electricity Distribution Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1700402633</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4548751</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1148106</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>255203208.13</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1171480.51</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3189516.81</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>257778280.3</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1431738.34</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3384143.28</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>252296871.18</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1751495.72</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3359705.66</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>264517632.7</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1955623.27</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3188479.28</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>259615057</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2327097</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3376117.21</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>261072009.43</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2418920.77</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3455907.59</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>266377560.14</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2350361.86</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3593363.89</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>273489555.22</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2468584.72</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3524363.86</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Orangeville Hydro Limited</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>265661013.98</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2325999.85</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>4743703.62</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1119094008</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4247024</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1116878154</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5419564</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1069392138</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4782546.4</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1119129067</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5496451.13</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1090152060</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5093393.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1083975365.49</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5191652.6</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1086364636</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>5057069.43</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1119165387.16</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4998156.01</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Oshawa PUC Networks Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1111397113.12</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>4118455.84</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>131343212</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>60775155</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2261695</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>138968687</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>51775219</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2514637.44</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>105580388.05</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>80114865.98</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2226398.53</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>128340976</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>65288893</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2939080.4</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>132972690.69</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>59289448.86</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2539835.59</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>116856307</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>69857369</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2616801.79</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>122359616.27</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>66895975.7</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>498876.25</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>134466549.09</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>53005989.16</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>615983.26</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Ottawa River Power Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>132703967.71</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>66112823.74</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>605262.58</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>622601312</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>75916065</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>601961594</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>67996867</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>578895847</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>74074624</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>583974298</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>82762000</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>589155257</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>71267915</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>560260011</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>80485738</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>545486097</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>83271017</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>562672092</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>79542814</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>PUC Distribution Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>546776249.32</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>82292491.06</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>75231804</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>15681690</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>69542062</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>20282136</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1059577.47</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>59037974.94</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>29868243.7</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>972642.72</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>72670799.04</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>17920384.39</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1109271.35</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>71033275.17</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>19238393.04</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1031059.67</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>61728008.84</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>26540691.05</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1121650.3</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>61303167.19</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>25647361.53</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1130381.19</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>68703258.11</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>21307298.05</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1376852.56</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Renfrew Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>65091954.8</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24033760.97</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1442094.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>112605314</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>79072</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1890048.85</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>106048441</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>80385</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1715114.07</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>103596314</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>67885</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1634840.56</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>106590178</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>53737</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1552511</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>105104266</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>72537</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1710209.42</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>104847718</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>66634</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1884603</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>105298006</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>69681</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1901155.01</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>109448698</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>64368</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2099273.53</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Rideau St. Lawrence Distribution Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>107217123</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>53212</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2082052.71</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>83393450.06</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>75181.73</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>75446074.61</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>69093.03</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>77814554</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>82344.74</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>82722814</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>76210.34</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>84197527.72</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>73758.99</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>82217897.35</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>91340.7</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>82084430.87</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>89959.11</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>87798014.5</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>74915.34</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Sioux Lookout Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>84176256.74</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>71979.44</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1035888390</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>44843068</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>991529511</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>42896903</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>970599301</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>43813295</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>984820505</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>42976010</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>981374552</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>36919390</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>940795941</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>40329414</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>936335023</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>40821829</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>972269482</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>33996161</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Synergy North Corporation</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>950222893</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>33123351</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>199054888.35</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1773027.2</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>200401892.57</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1283328.61</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>187948804.58</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1793222.6</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>188895422.41</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1611431.55</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>176022716.35</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1690597.78</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>171936531.68</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1762886.09</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>176063157.33</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1713055.81</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>183727214.46</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1775669.07</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Tillsonburg Hydro Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>181216017.58</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1545570.1</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>25064574115.08</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>62484563.8</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>447410.03</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>25488797878.4023</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>99113851.0800999</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>312025</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>24510929832.02</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>106851827</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>312025</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>25285109759</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>118876229.1</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>309538.25</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>24601758980.94</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>120713309.0129</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>403825.76</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23862009227.36</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>126439949.1</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>540047.64</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23638762267</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>138030781</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>657420.06</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>24343758708</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>133101052</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>463941</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Toronto Hydro-Electric System Limited</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>23896755028.92</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>125075936.1708</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>371115.88</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>130062006</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>308294.37</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1882137.52</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>133035339</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>705456</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1985945.69</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>129308374</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1071584</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1822348.57</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>137467512.56</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1559522.6</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1969212.6</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>138381131.65</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1454238.22</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1998448.27</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>144616066.69</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1624059.47</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2509691.53</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>148216872.94</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1498849</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2643413.32</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>151089376.05</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1427998</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2862262.35</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wasaga Distribution Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>149669715.39</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1519962.99</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>3045697.8</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>351504930</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>21669995</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>357721538</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>23098899</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>347356727</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>21439643</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>371676518</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>21991558</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>361809938</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>22847159</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>355930774</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>24031590</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>360135238</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>23622282</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>369157503</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>23418623</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Welland Hydro-Electric System Corp.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>364010637</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>22496003</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>111789934.17</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>390795</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1365801.55</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>108699219.95</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>413215</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1440267.76</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>106743638.1</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>379063.88</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1476021.24</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>106275600</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>391087.5</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1480085.39</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>104522560</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>392026.14</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1490284.79</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>100300140</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>406682.7</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1671806.45</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>104964520</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>409860.87</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1865366.08</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>111860580</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>421265.95</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2022777.73</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Wellington North Power Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>119924468.57</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>428615.92</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>2360709.66</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2015</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>460134758</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>999109</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>6080692</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2016</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>440982898</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1937098</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>6449655</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2017</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>426570399</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>1654815</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2018</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>465753773</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2486848</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2019</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>466962607</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2499758</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2020</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>474309649</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2624710</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2021</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>473829448</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2436280</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2022</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>474832766</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2314938</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Westario Power Inc.</Company_Name>
		<Year>2023</Year>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>472605801</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>2389582</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>0</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
	<record>
		<Company_Name>Grand Total</Company_Name>
		<Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>1150913654683.31</Supply_Total_kWh_from_IESO-Controlled_Grid_or_the_Distribution_System_of_Host_Distributor>
		<Supply_Total_kWh_from_Embedded_Generation_Facilities>65188358218.8175</Supply_Total_kWh_from_Embedded_Generation_Facilities>
		<Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>1542207257.74567</Amount_Charged_by_Host_Distributor_for_Transmission_or_Low_Voltage_Services>
	</record>
</supply-delivery-data>