2006 electricity distribution rate decisions

The Board initiated a process to establish approved rates for electricity distributors based on updated revenue requirements, with the intent that these new distribution rates would be effective on May 1, 2006. Since it was necessary for electricity distributors to file individual applications in mid-2005 for May 1, 2006 implementation, the Board commenced a policy development process to develop generic guidelines for the rate-setting methodology used in setting May 1, 2006 rates. The result of this policy process is the Distribution Rate Handbook which provides filing requirements for 2006 distribution rate applications.

 

Utility

Decision and Rate Order

Atikokan Hydro Inc.

Aurora Hydro Connections Limited

Barrie Hydro Distribution Inc.

Bluewater Power Distribution Corporation

Brantford Power Inc.

Brant County Power

Burlington Hydro Inc.

Cambridge and North Dumfries Hydro

Canadian Niagara Power Inc.

Centre Wellington Hydro Ltd.

Chapleau Public Utilities Corporation

Chatham-Kent Hydro Inc.

Clinton Power Corporation

Collus Power Corp.

Cooperative Hydro Embrun Inc.

E.L.K. Energy Inc.

Enersource Hydro Mississauga Inc.

EnWin Powerlines Ltd.

Erie Thames Powerlines Corp

Espanola Regional Hydro Distribution

Essex Powerlines Corporation

Festival Hydro Inc.

Fort Frances Power Corporation

Grand Valley Energy Inc.

Gravenhurst Hydro

Greater Sudbury Inc.

Grimsby Power Inc.

Guelph Hydro Electric Systems Inc.

Haldimand County Hydro Inc.

Halton Hills Hydro Inc.

Hawkesbury Hydro Inc.

Hearst Power Distribution Company Limited

Horizon Utilities Corporation

Hydro 2000 Inc

Hydro One Brampton

Hydro One Networks Inc.

Hydro One Remote Communities Inc.

Hydro Ottawa Limited

Innisfil Hydro Distribution Systems Limited

Kashechewan Power Corp

Kenora Hydro Electric Corporation Ltd.

Kingston Electricity Distribution Limited

Kitchener-Wilmot Hydro

Lakefront Utilties

 

Lakeland Power Distribution Ltd.

London Hydro Inc.

Middlesex Power Distribution Corporation

Midland Power Utility Corporation

Milton Hydro Distribution Inc.

Newbury Power Inc.

Niagara Falls Hydro Inc.

Niagara-on-the-Lake Hydro

Norfolk Power Distribution Ltd.

North Bay Hydro Distribution Limited

Northern Ontario Wires Inc.

Oakville Hydro Distribution Inc.

Orangeville Hydro Limited

Orillia Power Distribution Company

Oshawa PUC Networks Inc.

Ottawa River Power Corporation

Parry Sound Power Corp.

Peninsula West Utilities Limited

Peterborough Distribution Inc.

Peterborough Distribution Inc. -Apshodel/Norwood

Peterborough Distribution Inc. -(Lakefield)

PowerStream Inc.

PUCDistribution Inc.

Renfrew Hydro Inc.

Rideau St. Lawrence Distribution Inc.

St. Thomas Energy Inc.

Sioux Lookout Hydro Inc.

Tay Hydro Electric Distribution Company Inc.

Terrace Bay Superior Wires Inc.

Thunder Bay Hydro Electric Distribution Inc.

Tillsonburg Hydro

Toronto Hydro-Electric System Limited

Veridian Connections Inc.

Veridian Connections Inc. _Scugog

Wasaga Distribution Inc.

Waterloo North Hydro Inc.

Welland Hydro Electric System Corp.

Wellington Electric Distribution Company

Wellington North Power Inc.

Westario Power Inc.

West Coast Huron Energy Inc.

West Perth Power Inc.

Whitby Hydro Electric Corporation

Woodstock Hydro

 

UPDATES

Date

Issue/Document

Dec 1-05

The Board has made available the Comparator and Cohorts Study for 2006 EDR conducted by Christensen Associates Energy Consulting LLC in accordance with the Board's commitment in the Report of the Board and the 2006 Electricity Distribution Rate Handbook issued on May 11, 2005.

The Board reminds parties that its decision in RP-2004-0188 was to develop and use comparators and cohorts data exclusively as a screening tool and not as a mechanism for the direct setting of rates for 2006. Although an analysis may identify an average level of spending, it would be incorrect to draw the conclusion that any particular level represented, in itself, an efficient level of spending.

Jul 5-05

The Board has issued filing guidelines concerning the adjustment of electricity Retail Transmission Service (RTS) Rates. If a distributor’s existing RTS rates are generating a consistent over- or under-recovery of Transmission Costs, the distributor should address this issue as part of the 2006 EDR application process.

Jul 5-05

The Board has released a Word document containing the schedules documented in the 2006 Distribution Rate Handbook, to assist distributors in the preparation of their 2006 electricity distribution rate applications.

 

Was this page helpful?
Please tell us why, to help us improve: