As part of its regulation of the electricity distributors, the Ontario Energy Board established a multi-year electricity distribution rate setting plan, which indicated that, commencing with the 2008 rates, each year a limited number of distributors would be identified and if any of them sought a general change in their distribution rates, the application had to be based on Chapter 2 of the Board’s Filing Requirements, issued November 14, 2006 (EB-2006-0170). This meant that the distributor had to submit a forward test year, cost of service based application (CoS application).

For any of the other distributors seeking approval to change their distribution rates, the basis for their applications would be a mechanistic, formulaic update of their current rates (IRM application), similar to the process used for the 2007 rates.

On May 27, 2008, the Board identified a list of 28 electricity distributors that would be subject to this process, should any of them seek changes to their distribution rates for 2009. The letter requested that any distributor wishing to be removed from the list file a letter with the Board by June 20, 2008. Three distributors filed letters indicating their desire to be removed from the list. Should these distributors seek approval to change their distribution rates for 2009, the basis for their applications would be a mechanistic, formulaic update of their current rates (IRM application).

The following table lists the key standard documents of a distributor’s rate application. These documents include: 

  • The “Application” as filed by the distributor, provided as an Adobe Acrobat PDF file.
  • The “Notice of Application” issued by the Board and to be published by the distributor. The purpose of the Notice is to inform the affected ratepayers and other stakeholders of the application, its nature and the impact on affected customers. It also outlines the process for the making of submissions and/or participation in the Board’s proceeding to consider the application.
  • For those distributors applying for rates based on the IRM application, the “Decision Model” provides the application model modified as necessary to reflect the Board’s decision.
  • The “Decision and Rate Order” issued by the Board when it has adjudicated on the application (the Decision) and the subsequent Rate Order that reflects the Decision in the actual Tariff of Rates and Charges.
Related information

Estimated Total Bill Impacts (pdf) (For those utilities whose Rate Orders have not yet been issued, no information is supplied in the bill impact chart. The chart will be updated as Rate Orders are released)

Estimated Total Bill Impacts for Hydro One Networks (pdf)

 

Click the column header to sort the table by DistributorProcess, Application Received or Updated on. Click the column again to switch between ascending/descending order. To filter results, start typing in the search field below. As you type the table will re-sort to only show rows that match what you type (e.g. typing 'Niagara' will show only the rows for Canadian Niagara Power Inc., Niagara Peninsula Energy Inc. and Niagara-on-the-Lake Hydro Inc.).

APPLICATION DOCUMENTS

Distributor

Application

Models

Notice of Application

Decision and Rate Order

Updated on

Atikokan Hydro Inc.
EB-2008-0158
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Mar 12-09 
Attawapiskat First Nation
EB-2008-0159
         
Barrie Hydro Distribution Inc.
EB-2008-0160
Application  Rate Generator

Supplementary Filing Model  
Notice of Application  Decision and Order  Mar 12-09 
Bluewater Power Distribution Corp.
EB-2008-0221
Letter - delay in filing 

Application
  Notice of Application  Proposed Settlement Agreement

Decision and Order 

Rate Order
Apr 27-09 
Brant County Power
EB-2008-0161
Application  Rate Generator  Notice of Application  Decision and Order  Mar 13-09 
Brantford Power Inc.
EB-2008-0162
Application  Rate Generator

Supplementary Filing Model  
Notice of Application  Decision and Order  Mar 20-09 
Burlington Hydro Inc.
EB-2008-0163
Application  Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Cambridge and North Dumfries Hydro
EB-2008-0164
Application  Rate Generator  Notice of Application  Decision and Order  Mar 12-09 
Canadian Niagara Power Inc. – Eastern Ontario Power 
EB-2008-0222
 
Application    Notice of Application  Decision

Rate Order
Aug 26-09
Canadian Niagara Power Inc. – Fort Erie
EB-2008-0223
Application    Notice of Application  Decision

Rate Order
Aug 26-09
Canadian Niagara Power Inc. - Port Colborne
EB-2008-0224
Application    Notice of Application  Decision 

Amended Decision and Rate Order
Oct 28-09 
Centre Wellington Hydro Ltd.
EB-2008-0225
Application    Notice of Application  Decision and Order 

Rate Order
 
May 29-09 
Chapleau Public Utilities Corporation
EB-2008-0165
Application  Rate Generator

Supplementary Filing Model  
Notice of Application  Decision and Order  Mar 13-09 
Chatham-Kent Hydro Inc.
EB-2008-0166
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
Clinton Power Corporation
EB-2008-0167
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
COLLUS Power Corp.
EB-2008-0226
Application    Notice of Application  Decision and Order 

Rate Order
May 1-09 
Cooperative Hydro Embrun Inc.
EB-2008-0168
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 11-09 
E.L.K. Energy Inc.
EB-2008-0170
Application  Rate Generator  Notice of Application  Decision and Order  Mar 13-09 
Enersource Hydro Mississauga Inc.
EB-2008-0171
Application  Rate Generator

Supplementary Filing Model  
Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 16-09 
ENWIN Utilities Ltd.
EB-2008-0227

Letter - delay in filing

Application - Pt. 1

Application - Pt. 2

  Notice of Application Decision and Order 

Rate Order
May 1-09 
Erie Thames Powerlines Corp.
EB-2008-0172
Letter - delay in filing 

Application
Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Apr 16-09 
Espanola Regional Hydro Distribution Corporation 
EB-2008-0173
Application 

Addendum
Rate Generator

Supplementary Filing Model  
Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 13-09 
Essex Powerlines Corporation
EB-2008-0174
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 10-09 
Festival Hydro Inc.
EB-2008-0175
Application  Rate Generator  Notice of Application  Decision and Order  Mar 12-09 
Fort Albany Power Corporation
EB-2008-0176
         
Fort Frances Power Corporation
EB-2008-0228
Application  Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Great Lakes Power Limited
EB-2008-0178
         
Greater Sudbury Hydro Inc. – Greater Sudbury Hydro Inc
EB-2008-0229
         
Greater Sudbury Hydro Inc. – West Nipissing Energy Services Ltd.
EB-2008-0230
Application

Application (update) 
  Notice of Application 

Notice of Application (francais)
Decision and Order

Rate Order
Jan 19-10 
Grimsby Power Inc.
EB-2008-0179
Application  Rate Generator  Notice of Application  Decision and Order  Mar 12-09 
Guelph Hydro Electric Systems Inc.
EB-2008-0180
Application  Rate Generator

Supplementary Filing Model  
Notice of Application  Decision and Order  Mar 16-09 
Haldimand County Hydro Inc.
EB-2008-0181
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
Halton Hills Hydro Inc.
EB-2008-0182
Application  Rate Generator

Supplementary Filing Model  
Notice of Application  Decision and Order  Mar 17-09 
Hearst Power Distribution Co. Ltd.
EB-2008-0231
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 12-09 
Horizon Utilities Corporation
EB-2008-0183
Application  Rate Generator

Supplementary Filing Model  
Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 17-09 
Hydro 2000 Inc.
EB-2008-0184
Application  Rate Generator

Supplementary Filing Model  
Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 13-09 
Hydro Hawkesbury Inc.
EB-2008-0185
Application  Rate Generator 

Appendix RTSR
Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 10-09 
Hydro One Brampton Networks Inc.
EB-2008-0186
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 13-09 
Hydro One Networks Inc.
EB-2008-0187
Application  Rate Generator - Legacy & Aquired Customers

Rate Generator - Sub-Transmission Customers

Supplementary Filing Model (part I)

Supplementary Filing Model (part  II)

Smart Meter Funding
Notice of Application

Notice of Application (francais)
Decision 

Rate Order
Jun 1-09 
Hydro One Remote Communities Inc.
EB-2008-0232
Application    Notice of Application Decision and Order 

Rate Order
May 26-09 
Hydro Ottawa Limited
EB-2008-0188
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Mar 16-09 
Innisfil Hydro Dist. Systems Limited
EB-2008-0233
Application    Notice of Application  Decision and Order 

Rate Order
Apr 30-09 
Kashechewan Power Corporation
EB-2008-0189
         
Kenora Hydro Electric Corporation Ltd.
EB-2008-0190
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
Kingston Electricity Distribution Limited
EB-2008-0191
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 12-09 
Kitchener-Wilmot Hydro Inc.
EB-2008-0192
Application  Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Lakefront Utilities Inc.
EB-2008-0193
Application  Rate Generator

Supplementary Filing Model
Notice of Application  Decision and Order 

Rate Order
Apr 7-09 
Lakeland Power Distribution Ltd.
EB-2008-0234
Letter - delay in filing 

Application
  Notice of Application Decision and Order 

Decision on Motion and Rate Order
Jun 30-09 
London Hydro Inc.
EB-2008-0235
Application      Decision and Order 

Rate Order
Sep 22-09 
Middlesex Power Distribution Corp.
EB-2008-0194
Application  Rate Generator  Notice of Application  Decision and Order  Mar 19-09 
Middlesex Power Distribution Corp. - Dutton 
EB-2009-0177
Application    Notice of Application Decision

Rate Order
Feb 22-10
Midland Power Utility Corporation
EB-2008-0236
Application    Notice of Application  Decision and Order 

Rate Order
Jun 23-09 
Milton Hydro Distribution Inc.
EB-2008-0195
Application  Rate Generator  Notice of Application  Decision and Order  Mar 12-09 
Newbury Power Inc.
EB-2008-0196
Application  Rate Generator  Notice of Application  Decision and Order  Mar 17-09 
Newmarket – Tay Power Distribution Ltd. – Newmarket
EB-2007-0776
 Application   Notice of Application  Decision and Order  Apr 23-09 
Newmarket – Tay Power Distribution Ltd. – Tay
EB-2008-0198
         
Niagara Peninsula Energy Inc. – Niagara Falls
EB-2008-0199
Application  Rate Generator  Notice of Application  Decision and Order  Mar 13-09 
Niagara Peninsula Energy Inc. – Peninsula West
EB-2008-0200
Application  Rate Generator  Notice of Application  Decision and Order  Mar 13-09 
Niagara-on-the-Lake Hydro Inc.
EB-2008-0237
Application    Notice of Application  Decision and Order 

Rate Order
Apr 27-09 
Norfolk Power Distribution Ltd.
EB-2008-0201
Application  Rate Generator 

Supplementary Filing Model
Notice of Application  Decision and Order  Mar 13-09 
North Bay Hydro Distribution Limited
EB-2008-0202
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 11-09 
Northern Ontario Wires Inc.
EB-2008-0238
Application    Notice of Application  Decision and Order 

Rate Order
May 27-09 
Oakville Hydro Distribution Inc.
EB-2008-0203
Application  Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Orangeville Hydro Limited
EB-2008-0204 / EB-2008-0177
(includes the former Grand Valley Energy Inc.)
Application  Rate Generator  Notice of Application  Decision and Order  Mar 19-09 
Orillia Power Distribution Corp.
EB-2008-0239
Letter - delay in filing 

Application
Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Oshawa PUC Networks Inc.
EB-2008-0205
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order 

Decision - Part II
Jun 10-09 
Ottawa River Power Corporation
EB-2008-0206
Application  Rate Generator  Notice of Application 

Notice of Application (francais)
Decision and Order  Mar 13-09 
Parry Sound Power Corporation
EB-2008-0378
Letter - delay in filing 

Application
  Notice of Application  Decision and Order  Mar 11-09 
Peterborough Distribution Inc.
EB-2008-0241
Application    Notice of Application  Decision 

Rate Order
Jun 25-09 
PowerStream Inc.
EB-2008-0244
Application - Pt. 1 

Application - Pt. 2

Application update - Pt. 1

Application update - Pt. 2
  Notice of Application  Decision 

Rate Order
Aug 13-09 
PUC Distribution Inc.
EB-2008-0208
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Mar 16-09 
Renfrew Hydro Inc.
EB-2008-0209
Application Rate Generator  Notice of Application  Decision and Order  Mar 12-09 
Rideau St. Lawrence Distribution Inc.
EB-2008-0210
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Mar 16-09 
St. Thomas Energy Inc.
EB-2008-0211
Application  Rate Generator  Notice of Application  Decision and Order  Mar 10-09 
Sioux Lookout Hydro Inc.
EB-2008-0212
Application  Rate Generator

Supplementary Filing Model
 
Notice of Application  Decision and Order  Mar 12-09 
Thunder Bay Hydro Electricity Distribution
EB-2008-0245
Application    Notice of Application

Decision and Order

Rate Order

Jul 7-09 
Tillsonburg Hydro Inc.
EB-2008-0246
Application    Notice of Application  Decision 

Decision and Rate Order
Aug 31-09 
Toronto Hydro-Electric System Limited
EB-2009-0069
Application - Pt. 1 

Application - Pt. 2

Application - Pt. 3
  Notice of Hearing  Oral Decision (pg. 128)

Rate Order 
Apr 16-09 
Veridian Connections Inc.
EB-2008-0214
Application  Rate Generator  Notice of Application  Decision and Order  Mar 13-09 
Wasaga Distribution Inc.
EB-2008-0215
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
Waterloo North Hydro Inc.
EB-2008-0216
Application  Rate Generator  Notice of Application  Decision and Order  Mar 11-09 
Welland Hydro Electric System Corp.
EB-2008-0247
Application    Notice of Application  Decision and Order

Rate Order
Jul 31-09
Wellington North Power Inc.
EB-2008-0217
Application  Rate Generator

Supplementary Filing Model 
Notice of Application  Decision and Order  Mar 17-09 
West Coast Huron Energy Inc.
EB-2008-0248
Letter - delay in filing 

Application
  Notice of Application Decision and Order 

Interim Rate Order

Rate Order (corrected)
Feb 3-10 
West Perth Power Inc.
EB-2008-0249
         
Westario Power Inc.
EB-2008-0250
Application    Notice of Application 

Decision and Order

 

Rate Order 
 
May 29-09
Whitby Hydro Electric Corporation
EB-2008-0251
Application    Notice of Application  Decision and Order  Mar 11-09 
Woodstock Hydro Services Inc.
EB-2008-0218
Application  Rate Generator  Notice of Application  Decision and Order  Mar 12-09 

 

UPDATES

Date Issue/Document

Apr 27-09

The Ontario Energy Board has posted the Revenue Requirement Work Form (“RRWF”) for use by electricity distributors to support draft Rate Order filings to implement Board Decisions in Cost of Service electricity distribution applications.  The RRWF is a  spreadsheet that, when completed, will provide key summary information on the rate base, net income, cost of capital, revenue requirement and bill impacts in accordance with the Board’s decision.

The RRWF does not replace any detailed rate model(s) that an applicant distributor may use to support its application.  Rather it provides key information in a common format to aid the Board, distributors and other stakeholders after the Board’s Decision is made and before a Rate Order is filed.

Mar 16-09

Today, the Ontario Energy Board initiated a consultative process to help it to determine whether current economic and financial market conditions warrant an adjustment to any of the Cost of Capital parameter values (i.e., the Return on Equity, Long Term Debt rate, and/or Short Term Debt rate) set out in the Board’s letter of February 24, 2009.

Mar 5-09

Today the Board announced the price escalator (or inflation index) for the 2nd and 3rd Generation Incentive Regulation mechanisms for adjusting electricity distribution rates effective May 1, 2009.

 

Consistent with the Board’s findings in its December 20, 2006 Report of the Board on Cost of Capital and 2nd Generation Incentive Regulation for Ontario's Electricity Distributors, the Board will use the annual percent change in the Implicit Price Index for National Gross Domestic Product (GDP-IPI) for Final Domestic Demand.  On March 2, 2009, Statistics Canada published the change for 2008 over 2007 as part of the National Economic Accounts.  The percent change is 2.3% (click for Statistics Canada reference).

The Board will adjust the price escalator in each distributor’s Incentive Regulation model such that this change is reflected in the 2009 distribution rates for electricity distributors that are under the 2nd and 3rd Generation Incentive Regulation mechanisms.

Feb 24-09

Today the Board issued a letter to all licensed electricity distributors informing them of Cost of Capital Parameter Updates for 2009 Cost of Service Applications.

Oct 29-08

Today the Board has posted an updated Questions and Answers to assist affected distributors in preparing their 2009 Incentive Regulation Mechanism (“2009 IRM”) applications for adjusted distribution rates for May 1, 2009.

Oct 23-08

Today the Board has posted Version 2.0 of the 2009 2nd and 3rd IRM Rate Generators that distributors should use in preparing its application.

Oct 22-08

Today, the Board has made available the 2nd and 3rd Generation IRM webcast conducted by Board staff on October 17, 2008 providing information on the 2009 Incentive Regulation Mechanism rate adjustment process and filing requirements.

Oct 21-08

Today the Board has posted OEB filing numbers assigned to distributors filing their 2009 Incentive Regulation Mechanism (“2009 IRM”) applications for adjusted distribution rates for May 1, 2009.

Oct 20-08

Today the Board has posted Questions and Answers to assist affected distributors in preparing their 2009 Incentive Regulation Mechanism (“2009 IRM”) applications for adjusted distribution rates for May 1, 2009.

Oct 3-08

Today, the Ontario Energy Board issued the 2009 electricity distribution incentive regulation (“IR”) rate application models. The models are to guide electricity distributors in the preparation and filing of incentive regulation mechanism applications to adjust distribution rates for 2009.

 

Was this page helpful?
Please tell us why, to help us improve:

Note: This form is intended for general feedback only. To report a specific problem that‘s time sensitive and/or may need further follow up, or to file a complaint with the OEB about an energy company, please contact us directly at contact us.